Trans Austria Gas Pipeline
The Trans Austria Gas pipeline is a natural gas pipeline that leads from the Slovak-Austrian border at Baumgarten an der March to Arnoldstein in the south, near the border with Italy. Natural gas originating from Russia is transported to and used in Italy and Austria. In addition, it supplies Slovenia through the SOL Pipeline System, which branch-off at Weitendorf.
Technical features
The pipeline is long. The original two lines date back to the 1960s, but in 2006 the pipeline was extended by adding the third line. The extension cost US$157 million.The capacity of the pipeline is 41 billion cubic meters of natural gas annually. The construction of two additional compression stations increased the capacity to 47.5 bcm at end 2008.