Otoyol


The Otoyol is the national network of controlled-access highways in Turkey. The term Otoyol translates to motorway while the literal meaning is auto-route. The Otoyol was first opened in 1973.
As of December 2024, there are 3,796 km of otoyol in service, the network passes through 28 provinces out of 81 in Turkey.
The system previously consisted of three separate networks; the Edirne-Istanbul-Ankara corridor, the Aegean network centred on İzmir and the Southeastern network centred on Adana. With the completion of the O-5 in 2019 and the extension of the O-21 in 2020, these three networks have since been connected. The network is expected to expand to by 2053. The minimum speed limit on the Turkish otoyols is while the maximum speed is.

History

The construction of a national road system was prioritized in 1948, where the construction of new roads were greatly accelerated. This led to a rise in automobile usage in Turkey. By the 1960s, traffic problems were becoming prevalent in large cities and capacity on intercity roads needed to be upgraded. Plans to build new expressways were put into action in 1968, when construction of the Istanbul Inner Beltway was started. The Beltway, known as the O-1, was opened together with the Bosporus Bridge in 1973 with great fanfare. This became the first motorway to be built in Turkey. The Istanbul Beltway was then to be a part of a large expressway spanning from Edirne, in East Thrace, to İskenderun, on the eastern shore of the Mediterranean Sea. Construction of this expressway first started in 1973 on a section between Pozantı and Akçatekir, on what would become the O-21. In 1975 construction of a section of the motorway from Gebze to Izmit was started. Due to financial problems during the following years, construction of the two otoyols were greatly slowed down. It wasn't until 1984 that these two motorways were opened to traffic.
Turgut Özal became Prime Minister in 1983 and brought forth a policy of constructing new otoyols in Turkey. In 1985, construction of an intercontinental motorway spanning from Edirne to Ankara was started. This motorway project would serve as an outer beltway round Istanbul and also included the construction of a second bridge over the Bosporus, the Fatih Sultan Mehmet Bridge. The first section of the motorway, the long Edirne Beltway, was opened in 1987, followed by the opening of the Outer Beltway in Istanbul, from Levent to Kozyatağı, together with the FSM Bridge on 3 July 1988. The motorway was opened in sections in the following years until being completed in 1994.
2 decades later O-7 or Third Beltway opened in 2017.
In 1988 the construction of three new motorways in İzmir were started.
O-32 opened in 1992 and it became first motorway in Agean Region. O-30 was built a year after.
And a year after O-31 was opened, running between İzmir and Aydın.
Finally in 2008, O-30 was completed. First section of O-5 was opened between Kemalpaşa and Bornova,
after that in 2019 the motorway opened by phases section between Balıkesir junctions opened in 2018 and Kemalpaşa and Akhisar section was opened in March 2019 and in August 2019 remaining sections opened between Akhisar and Balıkesir West, Balıkesir North and Bursa West junctions. In 2020 two new motorways opened to the traffic. O-33 was opened in February 2020, as a continuous part of O-30, and in November 2020 the first section of O-21 extension was opened and in December 2020 was fully opened to Niğde. In 2021 the 8th phase of O-7 opened, and on 18 March 2022 Otoyol-6 opened between Malkara and Lapseki. Including the 1915 Çanakkale Bridge.
Today, two motorway extensions under construction: In O-7 9th phase between Nakkaş-Başakşehir link road and O-31 extension to Denizli, opening in 2023.

Network map

List of Otoyol routes

Future Projects

The motorway network is expected to reach 8,325 kilometres by 2053. Future projects can be seen in the chart below:

Under Construction

NumberLength Length Northern or western terminusSouthern or eastern terminusOpensNotes
4528 near Nakkaş, Istanbul near Başakşehir, Istanbul2026
5232.3 in Kızkalesi, Mersin near Çeşmeli, Mersin2026
12074.6 in Mamak, Ankara in Delice, Kırıkkale2026Part of Ankara-Samsun Motorway. Delice-Samsun section still in planning phase.
12275.8 in Antalya in Alanya2027Part of Afyon–Antalya–Alanya Motorway. Afyonkarahisar-Burdur-Antalya section still in planning phase.
12778.9 near Malkara, Tekirdağ near Kınalı, Istanbul2027Part of Kınalı-Balıkesir Motorway.
19.211.9 near İskenderun, Hatay near Topboğazı, Hatay2028İskenderun-Antakya Motorway
31.319.5 near Dörtyol, Hatay near Hassa, Hatay2030Dörtyol-Hassa Motorway

Tender Phase

NumberLength Length Northern or western terminusSouthern or eastern terminusTender DateNotes
13080.8 in Sivrihisar in Tulumtaş, AnkaraN/APart of İzmir–Ankara Motorway. İzmir-Sivrihisar section still in planning phase.
454282.1 near Şanlıurfa near Habur, Silopi, ŞırnakN/AŞanlıurfa-Mardin-Habur Motorway

Planning Phase

NumberLength Length Northern or western terminusSouthern or eastern terminusTender DateNotes
276171.5 near Akyazı, Sakarya near Sincan, AnkaraN/ACentral Anatolian Motorway
3018.1 in Taşucu near Kızkalesi, MersinN/A
8955.3 near Pozantı, Adana near Ceyhan, AdanaN/AAdana peripheral motorway
13785.2 in Gerede in IlgazN/APart of. Ilgaz-Merzifon-Koyulhisar-Pülümür-Horasan-Gürbulak sections still in planning phase.
127.46 near Sasalı, İzmir near İnciraltı, İzmirN/A - Gulf of İzmir Passage Project between Çiğli and Balçova ; including one undersea tunnel and one bridge
4125.5 near Menemen, İzmir near Buca, İzmirN/Aİzmir 2. peripheral motorway
15596.3 in Denizli near Bucak, BurdurN/ADenizli-Burdur section of Aydın-Denizli-Burdur Motorway
13785.1 near Lapseki, Çanakkale near BalıkesirN/ALapseki-Balıkesir section of Kınalı-Balıkesir Motorway
350217.5

Toll

Most motorways are toll roads. The toll is based on the distance traveled. On most sections, the toll can be paid only with RFID-based HGS. Cash, OGS and KGS methods have been abolished in recent years. Only the newly opened Otoyol 5, and Otoyol 7 have sections where it is possible to pay by cash or with credit card. Apart from motorways, the other state roads in Turkey are free of charge.
The revenue from tolls in 2001 were still about $203 million, rising by 2012 to approximately $542 million. In 2012, the Bosphorus bridges saw 150 million vehicles pass and the other toll roads saw over 210 million vehicles. In 2015, both bridges were used by 141 million vehicles while the other toll motorways were used by 271 million vehicles, generating a total revenue of $391 million.

Standards

Mainly because the country already has a wide network of double carriageways, the standards for motorways in comparison are very high. Most sections of otoyols have 3 lanes in each direction, aside from the O-4 around Izmit, a small stretch of the O-3 between Silivri and Esenyurt, and the section of O-32 between Alaçatı and Çeşme, which only have two lanes in each direction. Also the O-2, the O-7 and the O-20 all have four lanes in each direction along the entire route. The lanes are each 3.75 meters wide. Most exits have a connection road, which helps avoiding wrong-way driving and illegal access to the road.
The minimum speed is and the maximum allowed speed is, although speeding is not punished under. However, on sections of the O-1 through central Istanbul the speed limit is. In most tunnels the speed limit is.
Alongside otoyols, there are resting areas, which are standardized as A, B, C and D type service areas. The D type is mainly a parking area. The C type has a fuel station added. The B type has a fuel station and a vehicle service station added. The A type additionally has a motel.
Dangerous stretches such as tunnels or bridges where there is often fog, exits, interchanges and service areas are illuminated.
Since gradients are expected to be very low and turning radii are expected to be very high, otoyols have many bridges and tunnels which makes them very expensive to construct.
Otoyol signs in Turkey are green and uses the Highway Gothic typeface.

Statistics

Length

  • Longest otoyol:, O-21 between Ankara and Tarsus.
  • Shortest otoyol:, O-1 in Istanbul
  • Longest bridge: 1915 Çanakkale Bridge, carries the O-6 over the Dardanelles.
  • Longest tunnel: Tunnel 4 between Gebze and İzmit, on the O-7.
  • Highest pass: Cankurtaran Pass with 1.580 metres on the O-4 at Ankara-Bolu border.