Otluca HES
Otluca HES is a three-stage hydroelectric plant of Turkey.
It is in Anamur ilçe of Mersin Province. It is to the north of Anamur and on Dragon Creek. The main unit is at
Technical details
The technical details are as follows;| Name of the plant | Hydraulic head | Power |
| Otluca 1 | 36.9 MWe | |
| Otluca 2 | 5.8 MWe | |
| Boğuntu | 3.3 MWe |
The total annual energy production capacity is 224 GW-hr. But currently the last unit hasn't been put into operation yet.
The plant is being operated by the company Beyobası .