Derby Greenway


The Derby Greenway is a long multipurpose trail located on the west side of Derby, Connecticut along the Naugatuck and Housatonic Rivers. The Greenway is part of the Naugatuck River Greenway Trail System, a proposed multipurpose trail that follows the Naugatuck River from Torrington to Derby. The Derby section of the Naugatuck River Greenway System is the second-busiest multipurpose trail in Connecticut with 217,163 trips counted in 2021.

History

Construction broke ground in June 2005 and was completed in three stages, 2006, 2008, 2013 respectively.