The Cross-City Line is a suburban rail line in the West Midlands region of England. It runs for from Redditch and Bromsgrove in Worcestershire, its two southern termini, to Lichfield, Staffordshire, its northern terminus, via, connecting the suburbs of Birmingham in between. Services are operated by West Midlands Railway.
Cross-City Line services began in 1978, as a project of the West Midlands Passenger Transport Executive to improve local rail services. It made use of pre-existing railways lines, which previously did not have any through services. Services were extended to in 1980, and to in 1988. The route was electrified in 1993. In 2018, services were extended to, which was added as a second southern terminus.
History
Constituent railways
What is now the Cross-City Line was not built as a single route; it is a combination of lines opened by different companies at different times between 1837 and 1885.On the northern half of the route :
- The oldest section is between and, which was part of the Grand Junction Railway from Birmingham to, opened in 1837. This was extended towards the centre of Birmingham, at Curzon Street, the following year, and into Birmingham New Street in 1854.
- The line from Aston to was opened by the London and North Western Railway in 1862, and extended to in 1884, where it connected with the South Staffordshire line between and, which had opened in 1849.
- The Birmingham and Gloucester Railway had opened in 1840, following what is now the Cross-City Line between and, although this line ran to Curzon Street via what is now the Camp Hill line.
- The single-track branch line from Barnt Green to followed in 1859, as part of the Midland Railway's Gloucester Loop Line, which was closed south of Redditch in 1964.
- The Birmingham West Suburban Railway, taking the route of the Cross-City Line between and central Birmingham via, opened to its original terminus at in 1876, it was extended into Birmingham New Street in 1885, and the Granville Street terminus closed.
Prior to the creation of the Cross-City Line, the northern half of the route from New Street to Sutton Coldfield and Lichfield had a well used regular suburban service, which had been switched from steam to diesel multiple unit operation in 1956, leading to a large increase in usage. However, the southern half of the route from New Street to Redditch was a different matter: In 1964, the closure of all the stations between New Street and Redditch was proposed by the Beeching Axe. They were reprieved from closure in 1967; however, the service was cut back to a handful of trains at peak times for commuters.
1978: consolidated route
In the early-1970s, the West Midlands Passenger Transport Executive gained responsibility for managing and planning the local railway network in the West Midlands, and they set about looking for ways it could be improved: The WMPTE Passenger Transport Plan of 1972 recognised the need for a cross-city rail service, and especially an improved service to the south of Birmingham with new stations to serve the growth areas in the south of the city.The Cross City Line project was sanctioned by the WMPTE in May 1975 and launched on 8 May 1978. Costing £7.4 million, it involved joining the services into Birmingham from north and south into a single through service, along with the re-opening of Five Ways station and new stations to serve the University of Birmingham and . Most of the other stations on the southern half of the route were rebuilt at the same time, and improvements were made to signalling and junctions. Of the new stations, the only one to be officially opened was University, which the then Secretary of State for Transport Bill Rodgers MP formally opened on 8 May 1978. There is a plaque on platform 2 marking this occasion.
File:Longbridge Station - geograph.org.uk - 1601412.jpg|thumb|Longbridge railway station in 1979, still unfinished having opened the previous year. At this time diesel multiple units operated the service.
Services initially ran on a 15-minute frequency between Longbridge and Four Oaks via Birmingham New Street, with an hourly extension to Lichfield City, using refurbished Diesel multiple units. The new service was an instant success, and by the end of the first year was carrying 30,000 passengers daily.
1980s developments
Services were extended to in 1980, initially on an hourly frequency, increased to half-hourly in 1989. The service to Lichfield City was increased to half hourly in 1986, and on 28 November 1988, some services were extended to terminate at the re-opened high level platforms of.1990s: Electrification
By the late-1980s, the elderly diesels operating the service were becoming increasingly unreliable, and the WMPTE pressed for electrification. The decision to electrify the line was made on 7 February 1990 by the then Transport Minister Cecil Parkinson during the campaign for a by-election in the Mid Staffordshire constituency.Work started on electrifying the route with the 25 kV AC overhead line system in May 1990, and it was completed on 6 June 1993. Redditch, Alvechurch, and Blake Street stations were rebuilt at this time, and several other stations including Barnt Green were extensively modified to accommodate the new longer electric trains. The signalling was also modernised at the same time as the electrification, as part of a parallel scheme. A new fleet of Electric multiple units were introduced to work the electrified line, and replace the elderly diesels. Full service with the Class 323s did not begin until 1994, due to initial reliability problems with the new units. Some elderly, and EMUs were drafted in to operate services in the interim, along with some of the original diesel units.
The cost of the electrification scheme was estimated at £64.5 million, of which around 70% was funded by Centro, and the remainder by the Regional Railways sector of British Rail.
21st century developments
At Selly Oak, a new bridge was constructed in 2011 to carry the railway over a new section of the A38.The single track between Barnt Green and Redditch restricted the number of trains that could run to Redditch to two per hour. In November 2013 a scheme was approved to construct a new passing loop at to allow the service to be increased to three trains per hour. The line between Barnt Green and Redditch was closed for eight weeks for the works to be carried out, and was reopened on 1 September 2014. The improved service began in December 2014.
Electrification was also extended from Barnt Green to Bromsgrove station, which was rebuilt in 2016 and was added as a second southern terminus once electrification was completed in August 2018. These changes allowed three trains per hour to run to both Redditch and Bromsgrove.
Three of the ten new trains that London Midland introduced in 2014 displaced Class 323s on other routes in the West Midlands to enable an increase in capacity between Longbridge and Redditch, and the extension of all remaining Longbridge trains to Bromsgrove after electrification. Class 350s are not currently authorised to be used on the Cross City Line.
Post-pandemic the Cross-City Line weekday service has been reduced from 6 to 4 trains per hour in each direction usually operated by two sets of s, forming 6 cars. 6 trains per hour are expected to be reintroduced as part of Midlands Rail Hub. The were finally withdrawn from the line after 30 years of service, on 27 September 2024.
As part of the new West Midlands Trains franchise, they were replaced by Aventras.
Current services
In the December 2024 timetable, the off-peak weekday and Saturday service on the core section of the line between and comprises four West Midlands Railway trains per hour in each direction. Two northbound trains per hour continue from Four Oaks to while two southbound trains per hour continue from to, and the other two southbound trains per hour continue to.The service consists of:
- 2tph from to
- 2tph from to
Tracks are also shared with the Chase Line between and.
Future
There are long-standing proposals for the re-introduction of local trains on the Camp Hill line.In October 2018, as part of a 30-year strategy of Transport in the West Midlands several proposals were put forward. By 2034, there would be longer trains, electrification of the line from to allowing 2 services per hour to be extended to via a newly reopened. Beyond 2034, it was proposed that new semi-fast service could serve more larger stations.
There is also a single tracked mothballed line to the former Anglesey Sidings which was in use until 2001. The line remains in situ but rusty beyond repair. There is a possibility that the line which connected to Walsall from Lichfield via Brownhills and Pelsall could reopen as Mayor of the West Midlands Andy Street promised to look and make the reopening of the line feasible. West Midlands Combined Authority also released a plan for the line as part of a 10-year transport plan called the 2026 Delivery for Transport.