Abukuma Kyuko
Abukuma Express Co., Ltd. is a third-sector railway company headquartered in Date, Fukushima, Japan. Its sole service is the Abukuma Express Line.
History
Abukuma Express was founded on 5 April 1984 as a third-sector railway operator to take over operations of Japanese National Railways' Marumori Line, which ran between Marumori Station and Tsukinoki Station. An application for a railway operating license covering the full route between Fukushima and Marumori was submitted on 24 December 1984. The license was granted on 27 February 1985, followed by approval of construction works on 2 March 1985, allowing electrification of the existing section and the resumption of construction on previously unfinished segments.The Marumori Line was provisionally reopened as the Abukuma Express Line on 1 July 1986, following its transfer from Japanese National Railways to Abukuma Express, with services initially operated as a non-electrified line between Tsukinoki and Marumori.
The line was extended south to Fukushima Station on 1 July 1988, completing the full route between Fukushima and Marumori and the entire line was electrified using overhead supply.
Operations were suspended across the entire line following damage from the 2011 Tōhoku earthquake and tsunami on 11 March 2011, with services gradually restored in stages and full operations resuming on 16 May 2011. All services were again suspended on 12 October 2019 due to damage caused by Typhoon Hagibis; partial service resumed later that month, and full operations between Fukushima and Tsukinoki were restored on 31 October 2020. Another suspension occurred following the 2022 Fukushima earthquake on 16 March 2022, with services progressively reinstated and full operations resuming on 27 June 2022.
Operations
Abukuma Express operates the Abukuma Express Line, which runs from Fukushima Station in the south to Tsukinoki Station in the north.Rolling stock
Current vehicles
- — two-car electric multiple units introduced in 1988 consisting of AM8100 and AT8100 cars., two sets were in service.
- AB900 series — two-car electric multiple units introduced in July 2019 to replace the aging 8100 series, with plans to standardize the fleet on this model., seven sets are in service.
Past vehicles
- — Five diesel railcars borrowed from JNR for the provisional opening of the line in 1986. Following the full opening of the line in 1988 and the introduction of the 8100 series electric multiple units, these vehicles were returned to JR East, JNR’s successor.
- — A single three-car train acquired from JR East used between 30 October 2008 and 26 March 2016. It was used primarily on selected weekday morning and evening services.
Ownership
The shareholders of Abukuma Express are primarily the local and prefectural governments along its route. Its only private-sector shareholder is Fukushima Transportation, which holds a 20% stake and shares a platform with Abukuma Express at Fukushima Station.| Shareholder | Number of shares | Percentage of shares |
| Fukushima Prefecture | 8,400 | 28.0% |
| Miyagi Prefecture | 7,680 | 25.6% |
| Fukushima Transportation | 6,000 | 20.0% |
| Fukushima City | 1,836 | 6.1% |
| Date | 1,568 | 5.2% |
| Kakuda | 1,504 | 5.0% |
| Marumori | 1,062 | 3.6% |
| Sendai | 398 | 1.3% |
| Shibata | 221 | 0.7% |
| Natori | 221 | 0.7% |
| Iwanuma | 221 | 0.7% |
| Shiroishi | 150 | 0.5% |
| Nine unnamed shareholders | 739 | 2.5% |