Ōu Main Line
The Ōu Main Line is a railway line in Japan, operated by the East Japan Railway Company. It connects Fukushima Station through Akita Station to Aomori Station. Since the opening of the Yamagata Shinkansen on July 1, 1992, the Fukushima-Yamagata section is sometimes referred to as the Yamagata Line. The name of the line as a whole refers to the ancient provinces of Mutsu and Dewa, as it connects both ends of Mutsu by passing north–south through Dewa.
Route data
- East Japan Railway Company
- Total distance:
- *East Japan Railway Company
- **
- *Japan Freight Railway Company
- **
- **
- **
- Rail Gauge:
- *
- **Shinjō–Ōmagari
- **Akita-Aomori
- *
- **Fukushima–Yamagata
- **Uzen-Chitose–Shinjō
- *Both
- **Yamagata–Uzen-Chitose
- **Ōmagari–Akita
- Stations: 102
- Tracks:
- *Dual-track
- **Fukushima–Sekine
- **Akayu–Akayu Stoplight Station
- **Uzen-Nakayama–Uzen-Chitose
- **Ashisawa–Funagata
- **Nozoki–Innai
- **Ōmagari–Oiwake
- **Ugo-Iizuka–Hachirōgata
- **Kado–Moritake
- **Tsurugata–Maeyama
- **Takanosu–Hayaguchi
- **Ōdate–Nagamine
- **Ishikawa–Kawabe
- *Single-track
- **Sekine–Akayu
- **Akayu Stoplight Station–Uzen-Nakayama
- **Uzen-Chitose–Ashisawa
- **Funagata–Nozoki
- **Innai– Ōmagari
- **Oiwake–Ugo-Iizuka
- **Hachirōgata–Kado
- **Moritake–Tsurugata
- **Maeyama–Takanosu
- **Hayaguchi–Ōdate
- **Nagamine–Ishikawa
- **Kawabe–Aomori
- Electrification: All
- Block system: Automatic block system
- Depots: Yamagata, Akita
Services
The tracks were re-gauged between 1988 and 1992, with services commencing on 1 July 1992 under the Tsubasa service name. The rail gauge is to allow Yamagata Shinkansen trains to operate. The Ōu Main Line is known as the Yamagata Line on this section.This section is long, crossing the border between Yamagata and Akita. Demand is relatively low, and all trains except one limited-stop "Rapid" service operate as all-stations "Local" trains.Covering, this section is shared with the Akita Shinkansen, which is also a mini-Shinkansen line converted from narrow gauge to standard gauge. Services began on 22 March 1997 under the Komachi service name. The conversion involved the installation of a parallel single standard-gauge track. On a section between Jingūji and Mineyoshikawa, a third running rail was added to the narrow-gauge, allowing mini-Shinkansen trains to operate over either track. The arrangement allows narrow-gauge Ōu Main Line services to continue to operate between Shinjō and Akita.The northernmost section runs for between Akita and Aomori. Together with the San'in Main Line, Maizuru Line, Obama Line, Hokuriku Main Line, part of the Shinetsu Main Line, Hakushin Line, and the Uetsu Main Line, it forms part of the Nihonkai Jūkan-sen, used by both express and freight services.
Station list
Legend:| ● | All trains stop |
| ↓ | Trains stop when travelling in the indicated direction |
| All trains pass |
History
The Japanese national government built the Ōu Main Line, starting construction from Aomori in 1894, from Fukushima in 1899 and linking the two sections in 1905. In 1909 the formal name of the line was declared.Opening dates for the individual sections are as follows.
Ōu North Line
- December 1, 1894: Aomori–Hirosaki
- October 21, 1895: Hirosaki–Ikarigaseki
- June 21, 1899: Ikarigaseki–Shirasawa
- November 15, 1899: Shirasawa–Ōdate
- October 7, 1900: Ōdate–Takanosu
- November 1, 1901: Takanosu–Noshiro
- August 1, 1902: Noshiro–Gojōme
- October 21, 1902: Gojōme–Akita
- October 1, 1903: Akita–Wada
- August 21, 1904: Wada–Jingūji
- December 21, 1904: Jingūji–Ōmagari
- June 15, 1905: Ōmagari–Yokote
Ōu South Line
- May 15, 1899: Fukushima–Yonezawa
- April 11, 1901: Yonezawa–Yamagata
- August 23, 1901: Yamagata–Tateoka
- October 21, 1901: Tateoka–Ōishida
- July 21, 1902: Ōishida–Funagata
- June 11, 1903: Funagata–Shinjō
- October 21, 1904: Shinjō–Innai
- July 5, 1905: Innai–Yuzawa
- September 14, 1905: Yuzawa–Yokote, completion of Fukushima–Aomori connection
Line upgrading
The section between Niwasaka and Akaiwa stations proved to be geologically unstable, with one of the original tunnels collapsing in 1910. A realignment involving two new tunnels was opened a year later. Geological instability was suspected as the cause of a derailment on the section in 1948 that killed three crewmen, and another realignment was undertaken when the section was double-tracked in 1968.
Itaya station was originally a reversing station, and was realigned as a through station in conjunction with the gauge conversion work in 1990.
Electrification
The Fukushima to Yonezawa section was electrified at 1,500 V DC in 1949, and the Uzen-Chitose–Yamagata section in conjunction with the Senzan Line in 1960. Trials on the Senzan Line subsequently resulted in the adoption of 20 kV AC for all further electrification, and the abovementioned sections were converted to the new standard when the Yonezawa to Yamagata section was electrified in 1968. The Aomori to Akita section was electrified in 1971, as was the Akita to Uzen-Chitose section in 1975.Former connecting lines
- Akayu Station: The Yamagata Prefectural Government operated a gauge human powered tramway between 1919 and 1926.
- Oishida Station: The Obabazawa Railway opened a line to its namesake town in 1916, the line closed in 1970.
- Yuzawa Station: The Ogachi Railway Co. opened a line to Zentsu, electrified at 600 V DC, between 1928 and 1935. The last 3 km section closed in 1967, the electrification was decommissioned in 1971 and the rest of the line closed in 1973.
- Yokote Station: The Yokote Railway opened a line to Oikata between 1918 and 1930. Construction commenced on an extension to Maego station on the company's Yuri Kogen Railway Chokai Sanroku Line but was not completed. The 12 km section from Oikata to Niiyama was closed following typhoon damage in 1947, the section from Niiyama to Tateai closed in 1965 when a bridge was destroyed by floodwaters, and the balance of the line closed in 1971.
- Akita Station: The gauge Nibetsu Forest Railway, consisting of a main line and five branches between and in length operated between 1909 and 1968.
- Hachirogata Station: The Akita Chuo Kotsu operated a line to Gojome, electrified at 600 V DC, from 1922 until 1969.
- Odate Station: The Kosaka Railway opened a gauge line to its Kosaka Refinery in 1908, together with a 4 km branch from Shigenai to Kizawa the following year. Passenger services ceased on the Kizawa branch in 1926, and it closed in 1951. The Kosaka to Shigenai section was electrified in 1928, and extended in 1949, but was decommissioned when the line was converted to in 1962. Passenger services ended in 1994, and the remaining traffic was sulphuric acid, but following two major derailments the line closed in 2009.
- Kawabe Station: The 7 km line to Kuroishi was opened in 1912, transferred to the Konan Railway in 1984, the year that freight services ceased, and closed in 1998.
Gauge conversion
The success of this project led to the conversion of the Omagari to Akita section in conjunction with the opening of the Akita Shinkansen in 1997, and the extension of the Yamagata Shinkansen to Shinjo in 1999. These projects also created parallel 1,435 and 1,067 mm gauge lines between Omagari and Akita and between Yamagata and Uzen-Chitose respectively, and a dual-gauge section between Jinguji and Minejoshikawa, enabling Shinkansen trains to pass at speed on the mostly single-track line.
Additionally, local services continue to be provided on the gauge-converted lines by 701-5000 series standard-gauge suburban/interurban rolling stock.
Rolling stock
Local
- 701-5000 series
- 719-5500 series
- KiHa 100 series