E6 Series Shinkansen
The E6 series is a Japanese Shinkansen high-speed train type. It operates exclusively on Komachi services on the Akita Shinkansen, a mini-Shinkansen line between and Morioka, at speeds of up to. From Morioka, services continue to and from Tokyo on the Tōhoku Shinkansen, where the train is coupled or uncoupled from a Hayabusa service operated with an E5/H5 series train. Compared with the E3 series it replaced, the E6 series can operate at up to on the Tōhoku Shinkansen, up from, reducing journey times by an average of 12 minutes. The trains were designed by Ken Okuyama.
A total of 24 seven-car trainsets were built by Hitachi and Kawasaki Heavy Industries between 2012 and 2014. The first set, numbered G1, was delivered in June 2010.
Operations
The 7-car E6 series trains operate in conjunction with E5 series or H5 series 10-car trains, initially on just four return services daily from 16 March 2013. They replaced all of the previous E3 series trains on Komachi services by 15 March 2014.Design
The overall styling was overseen by Japanese industrial designer Ken Okuyama, and is intended to evoke images from the cultural identity of Akita Prefecture, including Namahage demons and kantō festival lanterns.The body is finished in "Hiun" white, a crimson roof and a "arrow silver" bodyside stripe.
The E6 series features a long, aerodynamically optimized nose to reduce tunnel boom and permit higher operating speeds. The nose is long— longer than that of the E3 series it replaces—allowing E6 series operation on the Tōhoku Shinkansen at speeds increased from.
The design incorporates technology developed through the Fastech 360 experimental train and the E5 series, with which the E6 is designed to operate in coupled service on the Tōhoku Shinkansen. Like the E5, the E6 uses an "arrow-line" nose profile, first tested on the Fastech 360, to improve aerodynamic efficiency and reduce noise at high speeds.
Trainsets are formed of seven cars, matching the seating capacity of six-car E3 series sets due to reduced seating in the end cars. All cars are equipped with active suspension to improve ride quality across varying track conditions and active tilting capability of up to 1.5 degrees to improve passenger comfort when operating at higher speeds.
Formation
Pre-production set S12
The pre-series train, numbered "S12", was formed as follows, with car 11 at the Tokyo end and car 17 at the Morioka end.- Car 11 provides Green accommodation.
- Cars 12 and 16 are each fitted with a single-arm pantograph. Like the E5 series, only one pantograph is normally used in service.
- Cars 11 to 14 were built by Kawasaki Heavy Industries, and cars 15 to 17 were built by Hitachi.
Full-production sets Z2–
The full-production trains, numbered "Z2" onward, are formed as follows, with car 11 at the Tokyo end and car 17 at the Morioka end.- Car 11 provides Green accommodation.
- Cars 12 and 16 are each fitted with a single-arm pantograph.
Interior
The new trains feature similar improvements to passenger accommodation as featured on the E5 series trains, including AC power outlets, and security cameras in vestibule areas. Seating in both Standard class and Green cars is in the standard 2+2 arrangement for mini-shinkansen trains. Seat pitch is in Green class and in Standard class, the same as for the E3 series trains. Cars 12, 13, 14, and 16 are equipped with toilets. The toilet in car 12 is universal access.History
The pre-series set, S12, was delivered to Sendai Depot in June 2010, and formally accepted by JR East on 8 July. Test running commenced on the Tohoku Shinkansen in July 2010.The first full-production set was delivered in November 2012, with production continuing until spring 2014.
Revenue service commenced on 16 March 2013 on new Super Komachi services, running at a maximum speed of on the Tohoku Shinkansen. From 15 March 2014, the maximum speed was raised to on the Tohoku Shinkansen, with the maximum speed on the Akita Shinkansen tracks remaining at, allowing journey times between Tokyo and Akita to be reduced by an average of 12 minutes. The service name was also returned to simply Komachi.
In May 2014, the E6 series was awarded the 2014 Laurel Prize, presented annually by the Japan Railfan Club. The award presentation ceremony was held at Akita Station on 8 November 2014.
Fleet list
, 24 sets were in service, as shown below.| Set number | Manufacturer | Date delivered | Date withdrawn | Remarks |
| Z1 | Hitachi/Kawasaki HI | 8 July 2010 | Pre-series set, originally numbered S12, modified February 2014 | |
| Z2 | Kawasaki HI | 19 November 2012 | Full-production sets | |
| Z3 | Kawasaki HI | 3 December 2012 | Full-production sets | |
| Z4 | Hitachi | 18 December 2012 | Full-production sets | |
| Z5 | Hitachi | 14 February 2013 | Full-production sets | |
| Z6 | Kawasaki HI | 14 March 2013 | Full-production sets | |
| Z7 | Kawasaki HI | 26 April 2013 | Full-production sets | |
| Z8 | Kawasaki HI | 18 May 2013 | Full-production sets | |
| Z9 | Kawasaki HI | 22 June 2013 | April 2022 | Withdrawn in April 2022 following damage sustained from the 2022 Fukushima earthquake. |
| Z10 | Hitachi | 27 June 2013 | Full-production sets | |
| Z11 | Kawasaki HI | 12 July 2013 | Full-production sets | |
| Z12 | Hitachi | 10 July 2013 | Full-production sets | |
| Z13 | Kawasaki HI | 24 August 2013 | Full-production sets | |
| Z14 | Hitachi | 30 August 2013 | Full-production sets | |
| Z15 | Kawasaki HI | 14 September 2013 | Full-production sets | |
| Z16 | Hitachi | 27 September 2013 | Full-production sets | |
| Z17 | Kawasaki | 9 October 2013 | Full-production sets | |
| Z18 | Hitachi | 25 October 2013 | Full-production sets | |
| Z19 | Kawasaki | 1 November 2013 | Full-production sets | |
| Z20 | Hitachi | 30 November 2013 | Full-production sets | |
| Z21 | Kawasaki | 11 December 2013 | Full-production sets | |
| Z22 | Kawasaki | 21 January 2014 | Full-production sets | |
| Z23 | Hitachi | 13 February 2014 | Full-production sets | |
| Z24 | Hitachi | 3 April 2014 | Full-production sets |
While the first sets from both Hitachi and Kawasaki Heavy Industries were delivered by sea to Sendai, set Z9 was delivered from the Kawasaki Heavy Industries factory in Kobe by rail to Akita Depot over three days from 31 May to 2 June 2013, mounted on temporary narrow-gauge bogies and hauled by freight locomotives. This was followed by set Z11 from 21 to 23 June 2013.