Wolseong Nuclear Power Plant
The Wolseong Nuclear Power Plant, or Wolsong, is a nuclear power plant located on the coast near Nae-ri, Yangnam-myeon, Gyeongju, North Gyeongsang province, South Korea. It is the only South Korean nuclear power plant operating CANDU-type PHWR. Korea Hydro & Nuclear Power owns the plant. These reactors are capable of consuming multiple types of fuel, including wastes from South Korea's other nuclear plants.
The power plant site including Yangnam-myeon. Yangbuk-myeon and Gampo-eup was designated an industrial infrastructure development zone in 1976. Construction of Wolseong 1 started in 1976 and was completed in 1982. In the following year, the power plant began commercial operations. This PHWR reactor has a gross generation capacity of 678 MW. Wolseong reactors 2, 3 and 4 were completed in 1997, 1998 and 1999, respectively. Each of these reactors has a capacity of 700 MW. Wolseong Nuclear Plant has since operated successfully.
Wolseong Nuclear Power Plant supplies about 5% of South Korea's electricity.
Shin-Wolsong Nuclear Power Plant
Shin-Wolsong No. 1 and No. 2, are two new OPR-1000 type pressurized water reactors. Shin-Wolsong 1 became fully operational in July 2012.In June 2013 Shin-Wolsong 1 was shut down, and Shin-Wolsong 2 ordered to remain offline, until safety-related control cabling with forged safety certificates is replaced. Shin Wolsong-1 was approved for restart in January 2014. In November 2014, Shin Wolsong-2 loaded its first core of nuclear fuel, and the plant was connected to the grid in February 2015, with commercial operation commencing in July 2015.
Incidents
On 22 June 2024, 2.3 tons of storage water in the spent nuclear fuel storage tank was released into the ocean through a drain while Wolsong Unit 4 was suspended for planned preventive maintenance and was undergoing regular inspections.On 12 January 2025, 29 tons of radioactive waste from the liquid material storage tank of Wolsong Unit 2 was discharged into the ocean without undergoing sampling analysis.
On 9 September 2025, 265 kilograms of heavy water was leaked from Wolsong Unit 2 reactor.