The Western Peripheral Expressway or Kundli–Manesar–Palwal Expressway, is an operational 6-lane, -long Expressway in the Haryana state of India. Along with the Eastern Peripheral Expressway, the Western Peripheral Expressway is expected to divert more than 50,000 heavy vehicles away from Delhi, which will help to maintain good air quality in Delhi. Western Peripheral Expressway along with Eastern Peripheral Expressway completes the largest Ring Road around Delhi. There are 10 tolled entries and exits, from north to south - Kundli, Kharkhoda, Bahadurgarh, Badli, Farrukhnagar, Panchgaon, Manesar, Taoru, Sohna & Palwal. Toll rate notified in December 2018 is INR1.35 per km for cars, INR2.18 per km for light motor vehicles, INR4.98 per km for trucks and buses, and two wheelers are not permitted on the expressway.
Two kilometer belt on either side of this expressway has been notified as controlled zone where five new contiguous greenfield cities will be developed as part of Delhi-Sonipat-Rohtak-Gurugram-Faridabad agglomeration. Delhi Metro Phase-V entails a proposed new metro route along this expressway.

History

The 53-km Manesar to Palwal section was inaugurated by Nitin Gadkari in April 2016. The remaining 83-km-long Kundli to Manesar section of KMP expressway was inaugurated by Prime Minister Narendra Modi on 19 November 2018. Toll plazas became operational on KMP Expressway in December 2018.
In 2003, the Western Peripheral Expressway was first proposed along with the Eastern Peripheral Expressway as a Build Operate Transfer project to construct a 135.6 km, access controlled four lane expressway from NH-1 near Kundli, Sonipat to NH-2 near Palwal. Since Delhi would benefit from rerouting the vehicular away from it, Delhi state agreed to bear half of the land acquisition cost of the expressway. In 2006, the Haryana government began work on Western Peripheral Expressway project, when the tender was awarded to KMP Expressways ltd. with commercial operations supposed to begin in June 2009, which was revised to May 2013. In 2016, repeated delays forced the Government of Haryana to terminate the contract and pay KMP Expressways and lenders as termination payment. In January 2016, after intervention of the Supreme Court of India, the project was revived and new bids were invited, and the plan was upgrade from four lanes to six lanes. The whole completed expressway became operational in November 2018.

Route and Interchanges

There are 10 tolled entry and exit points. There are 52 underpasses and 23 overpasses, including the following:
  • 4 railway overbridges,
  • 10 overpasses and underpasses at crossings on the national highways and state highways,
  • 7 overpasses, 9 underpasses and 27 underpasses at crossings on major district roads and village roads,
  • 33 agricultural vehicular underpasses, 31 cattle crossing passages, 61 pedestrian crossing passages.
Interchanges from north to south are:
LocationHighwayRouteType of road interchangeCorresponding Multimodel Passenger Interchange
KundliNH 44Delhi–Panipat–Ambala GT-RoadCloverleafKundli MMTS
KharkhodaSH 18Delhi-Bawana-Kharkhoda-RohtakT-Roundabout interchange & flyover
Delhi-Amritsar-Katra ExpresswayNE 5Delhi-Kharkhoda-Amritsar-KatraDouble roundabout interchange & flyover
BahadurgarhNH 9Delhi-Rohtak–Hisar–SirsaT-Roundabout interchange & flyoverBahadurgarh MMTS
BadliSH 123Jhajjar–Badli-GurugramT-Roundabout interchange & flyover
FarrukhnagarSH 15AGurugram-JhajjarT-Roundabout interchange & flyover
PataudiNH 352WGurugram-Pataudi-RewariT-Roundabout interchange & flyover
PanchgaonNH 48Gurugram-Bhiwadi–Rewari–JaipurCloverleafPanchgaon Chowk MMTS
TaoruNH 919Gurugram-Sohna-Bhiwadi-Jaipur-RewariT-Roundabout interchange & flyover
SohnaNH 248AGurugram-Nuh–Ferozepur JhirkaT-Roundabout interchange & flyover
Triple Interchange
Delhi-Mumbai Expressway
DND-KMP Expressway
NE 4
NH 148NA
Delhi-Gurugram-Vadodra-Mumbai
Delhi-Gurugram-Sohna-Faridabad-Palwal
Triple roundabout interchange & connecting road
PalwalNH 19Faridabad–Hodal–Mathura–Agra–Yamuna ExpresswayCloverleafBalramgarh MMTS

Facilities

The expressway has fuel refilling stations, 2 truck stops, 4 bus stands, 1 medical trauma centre with helipad, traffic police stations and 5 passenger multimodel transit stations with refreshment and recreational facilities.

Theme Cities

The Government of Haryana envisages development of profile land uses as Knowledge City, Medi City, Fashion City, Leisure and Entertainment Cities, Cyber City and Dry-Port facility along with other similar developments, resulting in establishment of five new cities 2 km wide on either side along this express way in public-private partnership mode. Haryana govt has notified this plan and implementation started by inviting bids for preparing the Master Plan for the first city as 50,000 hectare 'Manesar Global City.

Multimodal Transit Centres

is building 5 Multimodal Transit Centres along this expressway at Sonipat, Bahadurgarh, Gurugram and Faridabad in the following places for which the land has been already acquired :
From north to south:
Delhi NCT is the area of Delhi state. Core NCR, which also includes Delhi NCT area, is the area contained within and 5 km outside the circle formed around Delhi by the combination of WPE and EPE. Area outside of CNCR included in the NCR plan is called NCR Region. In addition to 4 ring roads in Delhi CNCR, the NCR Regional Plan 2041 also envisages construction of series of concentric expressways expanding away from and around Delhi which will be interconnected through several national and state highways originating from Delhi, which includes 3 Regional circular Expressways within NCR region and at least 3 Zonal circular Expressways.
  • Ring roads in Delhi NCR.
  • * Inner Ring Road: 40 km ring from Shalimar Bagh, Ashok Vihar, Punjabi Bagh, Rajouri Garden, New Moti Bagh, Hyatt Hotel, AIIMS Delhi, Lajpat Nagar, Kashmere Gate ISBT, ITO and Azadpur Mandi.
  • * Outer Ring Road:
  • ** Salimgarh–Rohini–Okhla Outer Ring Road: 47 km long 6-lane highway, ends abruptly at Salimgarh Fort, hence Kalindi Bypass is constructed to close the loop.
  • ** Kalindi Bypass ':
  • ** UER-II phase-1: from Alipur on NH44 in north Delhi to NH48 IGI Airport Shiv Murti.
  • ** UER-II phase-2: from NH48 IGI Airport Shiv Murti to Badarpur, via Rangpuri Bypass.
  • ** UER-II phase-3: from Badarpur to Noida-Greater Noida Expressway, over & along Sahadra Drain, to Akshardham and Loni.
  • * Fourth Ring Road in Core NCR: This greenfield route will have following subsections, it will be partially elevated and rest at grade.
  • ** Kundli–Narela–Dariyapur–Bahadurgarh Expressway : begins in north Delhi at NH48 Kundli Drain No 8'', via northwest of ITBP Camp at Saboli, west of Lampur, between Katlupur & Ghoga, Dariyapur, Jaunti, Garhi Rindhala, build a north bypass around Bahadurgarh, NH9 Bahadurgarh east bypass near UHBVN power station.
  • ** Bahadurgarh–Mitraon–Dharampur–South Gurugaon Expressway : in the west from Bahadurgarh south bypass at Balaur, Mitrao, Pandwala, bridge over Sahibi River between Jhatikara in Delhi to Dharampura in Gurugaon in Haryana, to Dwarka Expressway at Daultabad Chowk.
  • ** Gurgaon–Bandhwari–Pali Expressway : southwest of Delhi via Dwarka Expressway, Gurgaon Southern Peripheral Road to Ghata, Bandhwari, Dera Mandi, tunnel between Jirkhod temple & Pakhal.
  • ** Pali–Ankheer–FNG Expressway : south of Delhi from Pakhal, via Badkhal, to Ankheer Chowk where FNG begins.
  • ** Faridabad–Noida–Ghaziabad Expressway - Ankheer–Badshahpur–Noida Sector 168–Ghaziabad : 56 km long, with 28 km in UP & 28.1 km in Haryana, from Ankheer, to NH19, Faridabad Bypass Expressway, Badshahpur, Dhadhar, Lal Pur bridge over Yamuna to Chak Mangrola, Noida sectors to NE3 Delhi–Meerut Expressway, to NH34 near Arya Nagar.
  • ** Ghaziabad NPR–Loni–NH709B Expressway: from Ghaziabad NPR in west to Madhuban Bapudham–Raj Nagar Extension–Bhopura Road in Loni, to NH708B. Proposal has been sent by the Ghaziabad Development Authority to NHAI in January 2023.
  • ** Ghaziabad–Singhola Expressway : from FNG, Raj Nagar Extension Road, NH9 NAI Colony, Farukh Nagar, to Singhola.
  • ** Narela–Singhola–Subhanpur Expressway : from Narela at NH44 Singhola, via Jantipur, to Singhola.
  • ** Spurs: either express or signalfree.
  • *** Ferozepur Bangar–Nahra–Saboli–Singhu Road: from between Saboli–Safiabad to NH44 Singhu between Kundli & Narela.
  • *** Kharkhoda–Fereozepur Bangar–Ghoga–South Narela Road terminating at Sri Balaji Mandir on Bawana-Narela Road.
  • *** Bawana–Kanoda–Jasore Kheri Road to connect with Delhi–Amritsar–Katra Expressway.
  • *** Kanjhawala–Bahadurgarh Road:
  • *** Badli–Ghevra Road: along the way interchanges Kair and also with Najafgarh–Bahadurgarh Bypass spur of UER-II at south of Neelwal. Connect to Ghevra-Kanjhawala Road at Ghevra.
  • *** Najafgarh–Badli Road: interchange near Mitraon.
  • *** Badli–Qutub Vihar Road:
  • *** Badsa–Najafgarh Road: with bridge over Sahibi river.
  • *** Badli-BSF Camp- Dwarka Phase-II Road: to meet UER-II on southwest of IGI Airport.
  • *** Bamnoli-Shobha City Road: to connect Golf Course Road in Dwarka to Dhankot.
  • *** Farukh Nagar–Meoka-Sihi Roard: for direct connectivity.
  • *** Palra–Bhondsi–Ghata–Chattarpur–Chandani Chowk Road: interchange with NH248A at Bhondsi near Lemon Tree Hotel. Near Chattarpur it splits into two spurs to UER-II Phase-2 at two places – Mehrauli and Madangir. With a short spur as tunnel or elevated between Khshboo Chowk–Aya Nagar to Jaunaur to eliminate hill road.
  • *** Pali–Prithla–Hathin–Uttawar Road : will continue as greenfield expressway to Punhana, Nandgaon & Barsana, Govardhan & Deeg, greenfield bridge over Chambal between Bari & Joura then to Gwalior–Orai–Chattarpur–Raipur–Katni.
  • *** Prithla–Mohna Road: to Jewar Airport. With Shahpura–Maujpur spur, Prithla–Badshahpur along DFC.
  • *** Ankheer–NHPC-NSEZ: From Pali-Badkhal-NHPC-Ninay Nagar to bridge over Yamuna–Basantpur–ATS village–NSEZ to FNG.
  • *** Pali–Sohna: From Sohna to Delhi–Mumbai Expressway.
  • *** Wazirabad–Burari–Manauli–Bapauli Expressway: will begin at Shinghali bridge near Sangam Vihar along Bund Road to Burari, to WPE interchange at Manauli, to NH709AD Bapauli in Panipat. With following spurs: Burari–Loni–Hindon–Bhopura, Burari–Agraula–Farukh Nagar, Ghazibad NAI Colony, UER-III to Bakhtawarpur, Singhola on Narela-Bawana Road to Janti Khurd to Agraula, from NH44 Drain No 8 junction to Khstkar along the drain to WPE interchange at Bahera.
  • Regional Circular Expressways in NCR: These will form the circular expressways around Delhi within NCR region.
  • * Regional Circular Expressway-1 : WPE & EPE: The combination of existing Western Peripheral Expressway and Eastern Peripheral Expressway together form an inner-most regional circular expressway around the Core NCR.
  • * Regional circular Expressway-2 - Panipat–Rewari–Nuh–Jewar–Shamli:
This greenfield route will run through Panipat, Shamli, Meerut, Jewar Noida Airport, Palwal, Nuh, Bhiwadi, Rewari, Jhajjar, Rohtak and Panipat.
  • * Regional circular Expressway-3 :
This greenfield route will run through Karnal, Muzaffarnagar, Garhmukteshwar, Narora, Aligarh, Mathura, Deeg, Alwar, Mahendragarh, Charkhi Dadri, Bhiwani, Narnaund, Jind, Kaithal and Karnal.
  • Zonal Circular Expressway will connect the NCR Counter Magnet Cities & other important hubs with each other.
  • * Zonal Circular Expressway – Hisar–Dausa–Agra–Roorke–Kurukshetra: Hisar–Neem Ka Thana–Shahpura–Dausa–Agra–Hathras–Sambhal–between Moradabad & Amroha to Bijnore–Roorke–Kurukshetra –Narwana–Durjanpur–Kharkari–Hisar.
  • * Zonal Circular Expressway – Agroha–Patiala–Chandigarh–Haridwar–Bareilly–Gwalior–Jaipur-: It will pass through Agroha, Dhanaurie–Cheeka–Patiala–Chandigarh–Yanumanagar –Chhutmalpur–Haridwar–Bareilly–Firozabad–Pinahat–Morena –Sirmathura–Karauli–Lalsot–Jaipur–Neem Ka Thana–Sidhpur–Bhadra–Adampur.
  • * Zonal Circular Expressway – Bareilly–Kota–Dabwali–Baddi–Dehradun–Tikampur: will pass through Kalawali, Budhlada, Samana, Adi Badri, Kolar, Dehradun, Rishikesh, Lansdown, Nainital, Tikampur, Bisalpur, Bewar.