Vallavik Tunnel
The Vallavik Tunnel is a road tunnel in Vestland county, Norway. The tunnel begins on the north edge of the village of Eide in Voss Municipality and runs to the southeast, ending at the small farm of Vallaviki in Ulvik Municipality. The tunnel is part of Norwegian National Road 13. The tunnel was originally opened on April 27, 1985.
In 2013, a roundabout and a long branch were added near the southern end of the tunnel to connect with the newly constructed Hardanger Bridge. The branch passes directly over the older Djønno Tunnel.