Unev pipeline
The UNEV pipeline is a long pipeline from Woods Cross, Utah, United States, to the Las Vegas Valley at the Apex Industrial Park. This facility has the capacity to store of product. Expansion of the North Las Vegas Terminal was completed in 2014. An additional terminal facility, the Cedar City Terminal, is located in Cedar City, Utah, with the capacity to store of product.
This pipeline is the second oil pipeline for Las Vegas, adding capacity and providing a second source to the Calnev Pipeline. Completion was planned for operation in the spring of 2011. Commencement of operations was delayed to 2012 and is now operational.