The initial route for the first line was Bayankhoshuu and the III microdistrict, but later on changed to Yarmag and Kharkhorin. The groundbreaking ceremony for the first line of the cable car was held on 4 April 2024 at Artsat Valley, Yarmag, Ulaanbaatar. Land acquisition for the construction of the cable car towers have been completed by November 2024.
For the first line, the cable car line will connect Yarmag and Unur Khoroolol. It will stretch for a length of 4.2 km with two stops in between supported by 19 pylons and crosses Tuul River. It will have a total of 98 cabins with a maximum capacity of 10 passengers per cabin and a total transport capacity of 2,300 passengers per hour. The one-way journey for the trip will take 12 minutes.
The cable car cabins will feature heating system for winter months and ventilation for summer months, double power supply for redundancy and safety system.