U.S. Route 2
U.S. Route 2 or U.S. Highway 2 is an east–west United States Numbered Highway spanning across the northern continental United States. US 2 consists of two segments on either side of a portion of Canada. Unlike some routes, which are disconnected into segments because of encroaching Interstate Highways, the two portions of US 2 were designed to be separate in the original 1926 highway plan.
The western segment of US 2 begins at an interchange with Interstate 5 and State Route 529 in Everett, Washington, and ends at I-75 in St. Ignace, Michigan. The eastern segment of US 2 begins at US 11 in Rouses Point, New York, and ends at I-95 in Houlton, Maine.
As its number indicates, it is the northernmost east–west U.S. Highway in the country. It is the lowest primary-numbered east–west U.S. Highway, whose numbers otherwise end in zero, and was so numbered to avoid a US 0. Sections of US 2 in New England were once New England Route 15, part of the New England road marking system.
Route description
Western segment
Washington
Within Washington, US 2 is the northernmost all-season highway through the Cascade Mountains. It begins at I-5 and SR 529 in Everett and travels east via Stevens Pass. It intersects US 97 approximately east of Leavenworth and continues as a duplicate route crossing the Columbia River at Wenatchee, then continues north as far as Orondo, where US 97 splits north. US 2 continues to Spokane and the border in Newport.Idaho
Shortly after entering Idaho from the west, US 2 crosses the Priest River. US 2 follows Pend Oreille River to its source at Lake Pend Oreille. US 2 intersects State Highway 57 in the town of Priest River at mile 5.8. US 2 intersects US 95 at mile 28.4 in the town of Sandpoint. The two routes overlap for until just after Bonners Ferry. At Three Mile Corner, US 2 continues southeast for where it crosses into Montana.Montana
US 2 is a vital northern corridor for Montana and has more mileage within Montana than in any other state. It intersects US 93 at Kalispell and passes through the southern end of Glacier National Park, crossing the Continental Divide at Marias Pass, before it enters the Great Plains west of Browning. It travels through Shelby where it meets I-15, before it goes on to Havre, where it meets the northern terminus of US 87, intersecting with US 191 in Malta, and then onward to Glasgow. The highway continues east and leaves the state near the confluence of the Missouri and Yellowstone rivers.North Dakota
US 2 is an east–west highway that runs through North Dakota's northern tier of larger cities: Williston, Minot, Devils Lake, and Grand Forks. US 2 intersects US 85 at Williston, US 52 and US 83 at Minot, US 281 at Churchs Ferry, and the I-29/US 81 concurrency at Grand Forks. US 2 is four lanes from North Dakota's eastern edge to just past Williston, a stretch of about, leaving the remaining to the Montana border as a two-lane highway.In Rugby, just east of the route's intersection with North Dakota Highway 3, the highway passes the location designated in 1931 as the geographical center of North America. The monument marking the geographic center had to be relocated in 1971 when US 2 was converted from two to four lanes.
Minnesota
The portion of US 2 from Cass Lake to Bemidji is officially designated the Paul Bunyan Expressway. It also intersects US 169 and the Mississippi River in Grand Rapids. At the crossing between Duluth and Superior, Wisconsin, the highway crosses the Richard I. Bong Memorial Bridge, about in length—roughly in length when the above land approaches are included.Of the of US 2 in Minnesota, have four lanes, mostly located in the northwest part of the state.
Legally, the Minnesota section of US 2 is defined as Routes 8 and 203 in Minnesota Statutes §§161.114 and 161.115.
Wisconsin
After crossing the Bong Bridge and entering into the city of Superior, Wisconsin's western segment of the highway joins Belknap Street. After crossing the midsection of Superior, US 2 merges with US 53 for a few miles following East 2nd Street out of the city. US 53 and US 2 part ways outside of Superior. US 53 veers south toward Eau Claire, while US 2 continues to the city of Ashland and ultimately to the Wisconsin–Michigan state line at the city of Ironwood. An eastern segment of US 2 re-enters Wisconsin northwest of Florence and proceeds concurrently with US 141 for until exiting Wisconsin again near Iron Mountain, Michigan.Michigan
US 2 enters Michigan at the city of Ironwood and runs east to the town of Crystal Falls, where it turns south and re-enters Wisconsin northwest of Florence. It re-enters Michigan north of Iron Mountain and continues through the Upper Peninsula of Michigan to the cities of Escanaba, Manistique, and St. Ignace. Along the way, it cuts through the Ottawa and Hiawatha National Forests and follows the northern shore of Lake Michigan. It ends at I-75, just north of the Mackinac Bridge in St. Ignace.Eastern segment
New York
The road starts at US 11, just south of the Canadian border at Rouses Point in Champlain. From there, it crosses the Richelieu River at the outlet of Lake Champlain on the Rouses Point Bridge into Grand Isle County, Vermont. The road is less than long in the state.Vermont
US 2 traverses the length of Grand Isle County and crosses Lake Champlain over several bridges until it reaches the mainland in Milton and Chittenden County. From there, it travels south to Burlington, where it begins to closely parallel I-89 all the way to Montpelier, in Washington County. At Montpelier, the road turns northeastward, crossing into Caledonia County and passing through St. Johnsbury. It then passes into Essex County and eventually crosses the Connecticut River from Guildhall into Lancaster, New Hampshire.New Hampshire
Once into New Hampshire, the road continues southeastward, passing through Jefferson before heading more easterly, skirting the northern edge of the White Mountain National Forest into Gorham, where it meets Route 16, the major north–south roadway through the eastern half of the forest and past Mount Washington. From Gorham, the road travels east along the southern banks of the Androscoggin River to Shelburne and eventually crosses into Gilead, Maine. Throughout its entire stretch, the New Hampshire portion of US 2 is in Coös County.Maine
US 2 travels from Gilead to Houlton near Houlton International Airport. US 2 ends at I-95 just west of the Canadian border.History
A large portion of the western segment of US 2, and a shorter piece of the eastern segment, follows the old Theodore Roosevelt International Highway. This auto trail, named in honor of the late former president and naturalist Theodore Roosevelt, was organized in February 1919 to connect Portland, Maine, with Portland, Oregon. The route taken by this highway left Portland, Maine, to the northwest, crossing New England via Littleton, New Hampshire, and Montpelier, Vermont, to Burlington, Vermont. It crossed Lake Champlain on the Burlington–Port Kent Ferry and headed west across Upstate New York, through Watertown and Rochester to Buffalo. After crossing Southern Ontario, the highway re-entered the U.S. in Detroit, Michigan, running northwest and north via Saginaw and Alpena to the Upper Peninsula of Michigan, where it turned west along the northern tier of the country. This portion took the route past Duluth, Minnesota; Minot, North Dakota; Havre, Montana; and Glacier National Park to Spokane, Washington. In order to reach Portland, Oregon, the highway turned south in Washington via Walla Walla to Pendleton, Oregon, where it headed west again via the Columbia River Highway to Portland. The last piece of the highway to be completed was over Marias Pass through Glacier National Park; cars were carried through the park on the Great Northern Railway until 1930.The first interstate numbering for the Roosevelt Highway was in New England, where the New England road marking system was established in 1922. Route 18 followed the auto trail from Portland northwest to Montpelier, where it continued to Burlington via Route 14. Many of the states along the route also assigned numbers to the highway; for instance, New York labeled their portion New York State Route 3 in 1924. The Joint Board on Interstate Highways distributed its preliminary plan in 1925, in which a long section of the highway was labeled US 2, from St. Ignace, Michigan, west to Bonners Ferry, Idaho. East of St. Ignace, instead of crossing to the Lower Peninsula of Michigan like the Roosevelt Highway, the proposed US 2 traveled north to the international border at Sault Ste. Marie. It reappeared at Rouses Point, New York, following Route 30 and then rejoining the auto trail between Burlington and Montpelier. US 2 and the Roosevelt Highway both connected Montpelier to St. Johnsbury, but the latter took a direct path along Route 18, while the former was assigned to Route 25 to Wells River, where it overlapped proposed US 5 north to St. Johnsbury. There, where the Roosevelt Highway turned southeast to Portland, US 2 continued east along Route 15 to Bangor and Route 1 to Calais, then heading north on Route 24 to end in Houlton.
By the time the U.S. Highway system was finalized in late 1926, one relatively minor change had been made to US 2; it was swapped with US 1 between Bangor and Houlton, Maine, placing US 2 along the entire portion of Route 15 east of St. Johnsbury. Several other major parts of the auto trail received numbers, most notably US 30 from Portland, Oregon east to Pendleton, US 195 in eastern Washington, and US 23 in the Lower Peninsula of Michigan. In the mid-1930s, much of New York's portion of the road became US 104, and the part southeast of Littleton, New Hampshire, to Portland, Maine, became US 302, but by far the longest piece was that followed by US 2 between St. Ignace and Bonners Ferry. In 1946, US 2 was extended west of its original western terminus in Bonners Ferry in Idaho to Everett in Washington via Spokane along what was then US 10A.