USS Thomas C. Hart
USS Thomas C. Hart was a, named for Admiral and Senator Thomas C. Hart. Thomas C. Hart was laid down on 8 October 1971 at Westwego, La., by Avondale Shipyards, Inc.; launched on 12 August 1972; sponsored by Mrs. Reginald Bragonier, eldest granddaughter of Admiral Thomas C. Hart; and commissioned on 28 July 1973.
Initial cruises
The last combatant ship commissioned at the Boston Naval Shipyard, Thomas C. Hart conducted sea trials off the east coast before being homeported in Norfolk, Va. Following shakedown at Guantanamo Bay, Cuba, she returned to the Norfolk Naval Shipyard on 1 February 1974, where she underwent a major structural conversion, altering her after superstructure to accommodate the new Light Airborne Multi-purpose System facilities. She then steamed out for post-repair trials off the Virginia Capes.Deploying to the Caribbean, Thomas C. Hart conducted weapons systems tests and antisubmarine exercises and, upon completion of these duties, called at Port-au-Prince, Haiti, before returning to Guantanamo Bay for further training. After naval gunfire support qualification at Roosevelt Roads, she cruised to Bermuda for a three-day visit. She left Port Royal Bay on 3 September, having to do a "quick step" to avoid the tropical storm which later became Hurricane Delores, and arrived at Norfolk on 5 September.
In October, following type training in the Narragansett Bay area, the ship qualified for a certificate for unrestricted operations.
With Capt. W. R. Smedburg IV, Commander, Destroyer Squadron 10, and his staff embarked, Thomas C. Hart got underway on 18 November for Composite Task Unit Exercise 4-75 and nine days of intensive exercises. The following month, the ship passed her Nuclear Weapons Acceptance Inspection on 11 December and thus became a nuclear-qualified ship.
Deployment
The early months of 1975 were spent in preparation for Thomas C. HartEarly 1977 found Thomas C. Hart experiencing a period of maintenance, alteration, and testing. Of most significance was the installation of the Harpoon system, a highly sophisticated surface warfare missile which greatly extended Thomas C. Hart
Following post-deployment stand down, Thomas C. Hart engaged in CORTRAMID 78, an underway training period for midshipmen, which lasted from mid-June through early July. In late September 1978, Thomas C. Hart
On 30 August 1993 the ship was transferred to Turkey as TCG Zafer . Decommissioned, the ship was sunk as a target ship as part of Turkish Navy exercise Beyaz Fırtına 2016.