Tyra Field


Tyra Field is the largest gas condensate field in the Danish Sector of the North Sea. It was discovered in 1968 and production started in 1984. The field is owned by Dansk Undergrunds Consortium, a partnership between Total, BlueNord and Nordsofonden, and operated by Total. The reservoir depth is about and it covers area of in the water depth of. The Tyra field has a number of satellite fields, including Roar, Svend and Tyra Southeast fields.

History

In August 2017 Maersk Oil was sold to Total S.A. with the takeover completed in 2018.

Facilities

The Tyra Field has two production complexes named Tyra West and Tyra East, connected by pipelines. Tyra West includes oil and gas processing plants which in addition to the gas produced at the Tyra field, processes also gas from Halfdan field and the Valdemar oil field. The complex consists of two wellhead platforms, one processing and accommodation platform, and one gas flare stack. Tyra East processes also oil and gas from Valdemar, Roar, Svend, Tyra Southeast, Harald gas field, Lulita, Gorm and Dan oil fields. It consists of two wellhead platforms, one processing and accommodation platform, one gas flare stack, and one riser platform.
The installations developed for the Tyra field were:
InstallationLocation BlockPlatformsFunctionTypeLegsWell slotsInstalledProduction startProduction to
Tyra West6.2TW-AProcessing Steel jacket4March 1982May 1984TE-E
Tyra West6.2TW-BDrilling & wellheadSteel jacket412March 1982May 1984TW-A
Tyra West6.2TW-CDrilling & wellheadSteel jacket412May 19831985TW-A
Tyra West6.2TW-DFlareSteel jacket3April–May 1983
Tyra West6.2TW-EProductionSteel jacket1984
Tyra East6.2TCP-AProcessing & accommodationSteel jacket8March–June 1983June 1984TE-E
Tyra East6.2TE-BDrilling & wellheadSteel jacket412February 1983 1982June 1984TCP-A
Tyra East6.2TE-CDrilling & wellheadSteel jacket412May 19831985TCP-A
Tyra East6.2TE-DFlareSteel jacket3April–May 1983
Tyra East6.2TE-ERiserSteel jacket4March 19821984Jutland onshore
Tyra East6.2TE-FProductionSteel jacket1995

In total, the field has 20 gas-producing wells, and 28 oil and gas-producing wells.
Fluids from the drilling & wellhead platforms are routed to an inlet three phase inlet separator on the ‘A’ processing platforms. The separator separated the fluids into gas, condensate and produced water. Gas undergoes water dehydration through contact with glycol. On TCP-A the gas is comingled with gas from Gorm, Dan and Tyra West. The combined gas stream is chilled to achieve a hydrocarbon dewpoint. The gas is compressed from 1000 to 2000 psi in 5 Ruston TB5000 gas turbine driven gas compressors, and is fiscally metered before export onshore to Jutland. The design export rate is per day at standard conditions.
Condensate from the inlet separator is routed to a coalescer after which it is comingled with condensate from Tyra West. The combined stream is routed successively through a 1st stage, 2nd stage and 3rd stage separators operating at successively lower pressures. Gas from the 2nd and 3rd stage separators is compressed and joins the gas from the 1st stage separator and is routed into the inlet separator. Condensate from the 3rd stage separator is fiscally metered and is exported onshore via the Gorm installation. The design export rate is 20,000 barrels/day.
Produced water from the inlet separator is treated to remove and condensate and is discharged overboard.
Produced oil is transported to the Gorm E riser platform in the Gorm field, and further through the subsea pipeline to the oil terminal in Fredericia, Denmark. Produced natural gas is transported from the Tyra East riser platform to Nybro Gas Processing Plant, Denmark, and from Tyra West riser platform to the Netherlands through the Tyra West – F3 and NOGAT pipelines.

Redevelopment project

Due to the production facilities having sunk 6m Maersk Oil announced on 1 December 2017 Maersk Oil the redevelopment of Tyra Field, which would mean decommissioning the 35 year old facilities and installing new ones. The living and processing platform on Tyra East and Tyra West will be scrapped. One new living platform and one new processing platform will be built. The living quarter platform will be constructed by Italian EPC contractor Rosetti marino, while processing platform will be constructed in Kuala Lumpur by American EPC contractor McDermott International.
In July 2018 Modern American Recycling Services based in Frederikshavn secured a contract to scrap the two platforms.
Up until the temporary closure in September 2019, the Tyra field processed 90% of all gas produced in the Danish part of the North Sea.
The decommission project is estimated to cost 4 Billion DKK and the new facilities will cost 17 Billion DKK. All in all the project is expected use 1.3 million working hours.
The new facilities were planned to be ready for production in July 2022, but this was postponed to July 2023 due to the COVID-19 pandemic.

Tyra field satellites

The Tyra field has a number of satellite fields. These include Roar, Svend and Tyra Southeast fields.
The characteristics of the satellite fields are as follows.
FieldRoarSvendTyra Southeast
ProspectBentNorth Arne / Otto
ReservoirChalkChalkChalk
Geological ageDanian and Upper CretaceousDanian and Upper CretaceousDanian and Upper Cretaceous
Coordinates55.767485°N 4.64839°E56.178324°N 4.179324°E55.639618°N 4.882641°E
Block5504/75604/255504/12
Reservoir depth2,025 m2,500 m2,050 m
Field delineation84 km248 km2142 km2
ReservesOil 0.1 million m3
Gas 1.7 billion Nm3
Oil 0.5 million m3
Gas 0.1 billion Nm3
Oil 7.7 million m3
Gas 16.5 billion Nm3
Discovered19681975 North Arne, 1982 Otto1992

The Roar, Svend and Tyra Southeast fields are developed through three offshore installations as shown.
FieldRoarSvendTyra Southeast
Production start199619962002
Water depth46 m65 m39 m
InstallationSteel STAR platformSteel STAR platformSteel STAR platform
FunctionWellhead, separationWellheadWellhead, separation
Substructure weight tonnes9501150880
Topsides weight tonnes550575550
Number of wells4 gas42 oil, 5 gas
StatusClosed 2019Closed 2015Closed 2019
Export, well fluids11 km 16-inch multiphase pipeline to Tyra Eastpipeline to Tyra Eastpipeline to Tyra East

The oil and gas production profile of the Roar, Svend and Tyra Southeast fields is as shown.
Year199619971998199920002001200220032004200520062007200820092010
Roar32042732725928531717512198945135283024
Svend8361,356635521576397457280326324296299278195190
Tyra Southeast493343580614446377429374225

Year199619971998199920002001200220032004200520062007200820092010
Roar1,3321,9641,4581,2491,4071,7021,052915894860489367417398213
Svend8515284657548614338342828241627
Tyra Southeast4474521,2331,3371,108848889939911