Tokyo Aquatics Centre
The Tokyo Aquatics Centre is an indoor swimming pool in the Mori- Beach Park in Tatsumi in the Kōtō ward in eastern Tokyo.
Construction began in April 2017 and was completed in 2020. The total construction cost was 56.7 billion ¥. The opening, scheduled for 22 March 2020, was postponed due to the COVID-19 pandemic and took place on 23 July 2020 without an audience.
The swimming hall was built for the 2020 Summer Olympics and can accommodate up to 12,000 spectators. The arena was also used for swimming competitions at the 2020 Summer Paralympics.
The swimming arena has two swimming pools and a pool for water diving. The roof was built on the ground and raised step by step to a height of 37 metres. It is 160 metres long, 130 metres wide and 10 metres thick. The roof weighs 7,000 tonnes. In the future, the Aquatics Centre will host hundreds of national, international and junior competitions every year. Furthermore, the citizens of Tokyo will also be able to use the pool after the Games.