Synchronous grid of Northern Europe


The Nordic regional group of ENTSO-E is a synchronous electrical grid composed of the electricity grids of Norway, Sweden, Finland and the eastern part of the electricity sector in Denmark. The grid is not synchronized with the Continental Europe Synchronous Area, but has several non-synchronous DC connections with that as well as other synchronous grids. Gotland is not synchronized with the Swedish mainland either, as it is connected by HVDC. The grid also has HVDC submarine power cable links with the Baltic States.

DC Links

The Nordic system is connected to other synchronous areas by these links: