Senmō Main Line
The Senmō Main Line is a Japanese railway line in Hokkaido, operated by Hokkaido Railway Company, between Higashi-Kushiro Station in Kushiro and Abashiri Station in Abashiri. The name comes from Kushiro and Abashiri. In 2008, a dual-mode vehicle was tested on parts of the line.
On 19 November 2016, JR Hokkaido's President announced plans to rationalize its network by up to 1,237 km, or ~50% of the current network, including the proposed conversion of the Senmo Main Line to third-sector operation; if local governments are not agreeable, the line may face closure.
Stations
Closed stations
Service
Nearly all services on the line are Local services, which stop at every station. The Rapid Shiretoko train runs between and, with one daily return working.As of 16 March 2024, all services are operated by the H100 series.
History
In 1887 a private 41 km 1067mm gauge line was opened from a sulfur mine at Atsanobori to a refinery at Shibecha, 48 km north of Kushiro. Known as the Kushiro Railway, it closed 9 years later when the sulphur was mined out. 35 years after it closed the 17 km section of the Senmo line between Mashu - Shibecha was built on the formation of the Kushiro Railway.Construction of the Senmo line started from both Asashiri and Kushiro, with the northern portion opening to Satsutsuru in sections between 1924 and 1929, and the southern portion opening in sections to Kawayu between 1927 and 1930. The Satsutsuru - Kawayu section opened in 1931, completing the line.
Freight services on the line ceased in 2002.
Former connecting lines
- Abashiri Station - The Yumo Line to Nakayubetsu opened in sections between 1935 & 1952 and closed in 1987.
- Mokoto Station - A gauge line operated to Yamazono from 1935 to 1965. A 7 km branch line to Toyo Sawa operated from 1949 to 1962.
- Hamakoshimizu Station - Another gauge line extended 18 km east to service the sugar beet industry between 1941 and 1953.
- Yamubetsu Station - A private railway operated to Koshimizu from 1930 to 1939.
- Shari Station - In 1938, fears of Russian naval activity resulted in the decision to build a line to Shibubetsu through the Konpokutoge Pass for defence purposes. Construction was suspended in 1941 following the Soviet–Japanese Neutrality Pact. Construction recommenced in 1957 to service forestry activity, but was suspended again when the highway was upgraded. The line was opened 12.8 km to Koshikawa, servicing the local community until closure in 1970. A substantial brick arch bridge was built south of Koshikawa before construction was abandoned.
- Shibecha Station;
- Another gauge system connected the Numahoro District to Shibecha, consisting of a 23 km 'main line' opened 1955, and a 6 km branch opened 1966. Both closed in 1971.