Riverway station
Riverway station is a light rail station on the MBTA Green Line E branch, located at the intersection of South Huntington Avenue and Huntington Avenue in Boston, Massachusetts, slightly east of Brookline Village. The station is named for the Riverway parkway which runs on an overpass just to the west. Riverway is also the closest surface transfer between the D and E branches of the Green Line; Brookline Village station is about to the west.
The station is located on a street running segment of the E branch; trains run in mixed traffic rather than a dedicated median. The station has no platforms; riders wait on the sidewalks and cross the street to reach trains. Because of this, the station is not accessible.
In 2021, the MBTA indicated plans to modify the – section of the E branch with accessible platforms to replace the existing non-accessible stopping locations. The new platforms are planned to be long enough to accommodate two Type 10 vehicles. Design work began in July 2023. In December 2024, the MBTA indicated that platforms would be built at Riverway and, while and would be closed., design work is expected to be completed in late 2026, with construction taking place in 2027–2029.