Rapid KL
Rapid KL is a public transportation system owned by Prasarana Malaysia and operated by its subsidiaries Rapid Rail and Rapid Bus. The acronym stands for Rangkaian Pengangkutan Integrasi Deras Kuala Lumpur, which translates to Kuala Lumpur Integrated Rapid Transit Network in the Malay language. Rapid KL, with its of metro railway and of BRT carriageway, is part of the Klang Valley Integrated Transit System, operating throughout Kuala Lumpur and Selangor's satellite cities in the Klang Valley area.
The rail transit line was opened in 1996. It was followed by a federal government restructuring of public transport systems in Kuala Lumpur in the early 2000s after the bankruptcy of STAR and PUTRA Light Rapid Transit operators, the precursors to the Ampang/Sri Petaling Lines and Kelana Jaya Line respectively, and the creation of the Rapid KL brand. In 2003, it had inherited bus services and assets formerly operated and owned by Intrakota and Cityliner after being bailed out. Four years later, the Malaysian Government bailed out KL Infrastructure Group, the owner and operation concession holder of the KL Monorail, and placed it under ownership of Prasarana Malaysia. Since then, the Rapid KL system has expanded to include two MRT lines and a BRT line.
History
Planning and constructing
After the adoption of the Federal Territory Act of 1982, the Kuala Lumpur City Hall was obliged to prepare a structure plan for the areas under its jurisdiction. In line with this, the 1981 Master Plan Transportation Study Report specifically recommended the implementation of a light rapid transit system with exclusive rights-of-way and a capacity of 20,000 passengers per hour per direction. The proposed network has 4 corridors from the city centre to the northwest, northeast, southwest and southeast.In 1984, the Federal Government approved the construction of the LRT system but plans were abandoned soon after. The LRT project was revived with the signing of an agreement for Phase 1 of the STAR-LRT in December 1992. The LRT system was first opened in December 1996. This was followed by a second system operated by Projek Usahasama Transit Ringan Automatik Sdn Bhd in 1998.
Public transport restructuring
The operation of Kuala Lumpur's LRT lines since its inception had lower ridership than expected, which led to the concessionaire operators of the LRT lines, being unable to repay their commercial loans. The 1997 Asian financial crisis aggravated the situation, and by November 2001, the two companies owed a combined total of RM 5.7 billion. The Malaysian Government's Corporate Debt Restructuring Committee stepped in to restructure the debts of the two LRT companies. In 2002, both companies and their respective LRT services were bought over by Prasarana Malaysia, and operations of the lines eventually were transferred to Rapid KL. The STAR-LRT and PUTRA-LRT lines effectively became the Ampang/Sri Petaling Lines and the Kelana Jaya Line respectively.The Malaysian government would continue to bail out KL Infrastructure Group, which was the operator concessionaire holder and owner of the KL Monorail line, for RM 822 million. It was then promptly taken over by Prasarana Malaysia and operated by Rapid Rail in 2007.
The bus service in Kuala Lumpur was also facing problems with lower ridership due to an increase in private car usage and a lack of capital investments. The two new bus consortia formed in the mid 1990s to consolidate all bus services in Kuala Lumpur, Intrakota Komposit and Cityliner, began facing financial problems. Intrakota had reportedly accumulated losses amounting to RM450 million from the 1997 financial crisis until Prasarana Malaysia took over in 2003. With decreased revenues, the bus operators could not maintain their fleets, much less invest in more buses. Frequencies and service deteriorated as buses began breaking down, and ridership suffered as a result. Public transport usage in the Klang Valley area dropped to about 16% of all total trips as a result.
Rail network map
,
Services under Rapid KL
Rail
The entire rail network, operated by Rapid Rail is long and has 144 stations. The network's trains can travel up to 80 km/h. In 2008, the rail network carried a total of over 350,000 passengers daily, and has risen significantly since then. The BRT Sunway Line, despite being operated by Rapid Bus, is a component of and integrated with the Rapid KL rail network.Current services
Future services
Bus
The entire bus network is operated by Rapid Bus, one of the largest bus operators in the Klang Valley area, along with Transnasional. Currently, there are 98 stage bus routes and 39 feeder bus services which operate from the rail stations. The bus routes operated by Rapid Bus were previously operated by Intrakota Komposit Sdn Bhd, a subsidiary of DRB-Hicom; and Cityliner Sdn Bhd, a subsidiary of Park May Bhd. In 2008, Rapid Bus carried around 390,000 passengers daily.On 18 June 2020, Rapid Bus released new features on real time locations of bus in Google Maps, via collaboration with Google Transit. Almost 170 Rapid KL bus routes are covered with this real time feature. Rapid Bus also plans to expand the application to MRT feeder bus service, Rapid Penang, and Rapid Kuantan in the future. Now all the buses can be tracked via PULSE application.
Fares and ticketing
Rapid Rail implements an automatic fare collection system with stored value tickets and single journey tickets in the form of tokens. Tickets can be purchased either from ticket vending machines or at station counters found at all train statioms stations. Turnstiles are located at the entrances to train platform, which separate the paid area and unpaid area of the stations. In 2011, Prasarana Malaysia announced a new ticketing system, effectively integrating the different rail lines which previously functioned as different systems. The new system allowed passengers to transfer seamlessly between rail lines at designated interchange stations without exiting the system and paying multiple fares or buying new tokens.Touch 'n Go stored value cards are also accepted at fare gates on the Rapid Rail network as well as the Rapid Bus network as well as the KTM Komuter system to improve integration. The Touch 'n Go system is also used in the production of Rapid KL's monthly/weekly passes as well as their stored-value concession cards. These passes can be purchased by frequent users of the Rapid KL rail and bus networks, The Rapid KL concession cards are provided for students, the elderly and disabled people, which provides a 50% discount on all train and bus fares.
Services
The rail services operate daily from 6 a.m. to 11 p.m. The operation hours are extended for certain stations when special events such as the final of Piala Malaysia and the New Year's Eve countdown.| Rail Lines | Peak-Hour Headway |
| 3 minutes 6 minutes | |
| 3 minutes 6 minutes | |
| 3 minutes 2 minutes | |
| 7 minutes 5 minutes | |
| 4 minutes | |
| 5 minutes | |
| 4 minutes |
During the Movement Control Order, the waiting times between trains were extended to 10 minutes during peak hours and 30 minutes during other times, as fewer people went outside due to the lockdown.
On 10 September 2021, Rapid KL reduced its waiting times for trains and buses to support the growing number of workers going back to their reopened workplaces. On peak hours, trains arrived at around 4 to 10 minutes, on non-peak hours, trains arrived from 7 to 12 minutes, and on weekends they arrived on 7 minutes or 15 minutes.
Infrastructure
The Ampang Line and Sri Petaling Line are two sub-lines of a single LRT system, one a north–south line and one heading eastward. The Chan Sow Lin-Putra Heights route serves the southern part of Kuala Lumpur and the town of Puchong in Selangor. The Chan Sow Lin-Ampang route primarily serves the suburbs of Ampang in Selangor and Cheras in Kuala Lumpur, both of which are located in the northeastern region of the Klang Valley. Both lines converge at Chan Sow Lin; the merged line leads north, terminating at Sentul Timur.The Kelana Jaya Line consists of a single line that connects Putra Heights in the south to Gombak in the northeast, passing through the cities of Subang Jaya and Petaling Jaya, as well as the Kuala Lumpur city centre and various low density residential areas further in northern Kuala Lumpur. The line has a total of 870 individual bridges, the longest of which has a 68m span. The Ampang/Sri Petaling Lines and the Kelana Jaya Line intersect at and.
The Kajang Line runs from Kajang in the south to Kwasa Damansara in the north, where it meets the Putrajaya Line; the Putrajaya Line then proceeds southward towards Putrajaya Sentral, both lines passing through Kuala Lumpur. The Kajang Line and Putrajaya Lines serves to connect the city with the fringes of the Klang Valley, such as Sungai Buloh, Putrajaya, Cyberjaya, and Kajang, while also providing rail connection to neighbouring towns and cities such as Petaling Jaya, Seri Kembangan and Cheras.
The KL Monorail connects the KL Sentral transport hub in the south and Titiwangsa in the north with the "Golden Triangle", a commercial, shopping, and entertainment area in the heart of Kuala Lumpur, consisting of the Bukit Bintang area, and surrounded by Jalan Imbi, Jalan Bukit Bintang, Jalan Sultan Ismail, and Jalan Raja Chulan.
The BRT Sunway Line, the world's first all-electric bus rapid transit system, has an exclusive right-of-way and operates on an elevated guideway that is not shared with normal road traffic. The BRT line serves the high-density areas of Sunway and Subang Jaya.