Panjnad Headworks
Panjnad Headworks is a gated barrage on the Panjnad River about twelve kilometres north of Uch Sharif in Bahawalpur Division, Punjab, Pakistan, situated just below the confluence of the Chenab River and the Sutlej River where the five rivers of historic Punjab merge. The barrage supplies irrigation water to Bahawalpur and Rahim Yar Khan districts through the Panjnad, Abbassia and Abbassia Link canals and also moderates flood flows at the tail end of the Chenab system.
History
Panjnad Headworks construction began in 1927 under executive engineer James L. Roy and it was part of the British era Sutlej Valley Project. The barrage was originally designed with thirty three bays each sixty feet wide but after the collapse of Islam Headworks in 1929 the design was revised to forty seven bays to improve flood safety. Work finished in two phases by May 1931 and the river was diverted over the weir on nineteen December 1931; formal opening followed in 1932 when the Bahawalpur state inaugurated the highway bridge that spans the gates.In August 1973, inflow exceeded eight hundred thousand cubic feet per second and authorities breached the left marginal bund to protect the gates, inundating large parts of Bahawalpur Division. Similar exceedances in 1976 and 1992 are documented in long-term discharge records compiled for the Asian Development Bank improvement project.
In August 2018, structural deterioration led to closure of the road bridge after inspectors declared it dangerous. The rebuilt dual-carriage bridge reopened on fourteen August 2020, restoring a key section of the national highway between Karachi and Lahore.