Middle Marsyangdi Hydropower Station
Middle Marsyandgi Hydropower Station is a run-of-river hydro-electric plant located in Lamjung district of western Nepal. The flow from Marshyangdi River is used to generate 70 MW electricity. The plant is connected to the national grid of Nepal.
The plant was set to be commissioned in 2004 but it was delayed by four years. The plant faces siltation problems from time to time.