Marketplace substation
The Marketplace substation is a major electric power interconnection point in the western United States outside of Boulder City, Nevada. The station is in the Eldorado Valley.
Interconnects
- 500 kV McCullough substation
- 500 kV AC Adelanto substation, 1,291 MW,
- 500 kV AC Mead substation, continues to Westwing via Perkins Switchyard, 1,923 MW,
Power plants
Proposed
- 500 kV AC Moenkopi substation, completed