List of state highways in Punjab
This is a list of state highways and expressways in Punjab, India.
Expressways
Expressways in Punjab in India are as follows:Operational and under-construction
1. Delhi–Chandigarh–Shimla route.- * 1a. Chandigarh–Shimla Expressway NH-5
- ** 1a.1. Himalayan Expressway, 27 km, from Zirakpur to Parwanoo, part of Chandigarh–Shimla Expressway, operational.
- * 1b. Ambala–Chandigarh Expressway NH-152, 35 km, greenfield, operational. 2. Amritsar–Ludhiana–Chandigarh–Haridwar route:
- * 2a. Ludhiana–Rupnagar Expressway NH-205K, 91 km, Rs. 2792 Crore, greenfield, 4-6 lane access-controlled highway connecting Manewal village near Ludhiana on the "Delhi–Amritsar Expressway" with Bheora village near Rupnagar in Punjab. Land acquired for the stalled portion, which was 2 bridges, and entire route will be completed by December 2025.
- ** 2a.1. Kharar spur, includes a 19.5 km spur to Kharar, under construction, included in the 2a.
- ** 2a.2. Ludhiana Elevated Corridor, brownfield, operational.
- * 2b. Ambala-Shamli Expressway, greenfield, under-construction.
- * 2c. Chandigarh–Haridwar Expressway, greenfield, From Ramgarh to Dera Bassi, Narayangsrh, Sadhura, Pratap Nagar, Behat, Bahadarabad–Roorkee, Najibabad, Afzalgarh–Kashipur. Proposed, awaiting approvals.3. Delhi–Amritsar–Katra Expressway, 670 km, greenfield, 4-lane wide controlled-access expressway connecting Bahadurgarh border near Delhi with Katra in Jammu and Kashmir.
- * 3a. Nakodar–Amritsar Expressway spur, greenfield.
- ** 3a.1. Amritsar Ring Road, greenfield, part of Nakodar-Amritsar spur of DAKE.4. Amritsar–Jamnagar Expressway 'EC-3 NH-754, 1,257 km, greenfield, 6-lane expressway, operational.5. Ludhiana–Bathinda–Ajmer Expressway, 6-lane, Ludhiana–Bathinda greenfield, Bathinda-Taranagar greenfield, Taranagar-Fatehpur brownfiled, Fatehpur-Ajmer greenfield.6. Chandigarh–Fazilka route.
- * 6a. Sirhind–Sehna Expressway, 108 km, greenfield, 6-lane access-controlled highway connecting Fatehgarh Sahib and Sehna Khera via Malerkotla, Barnala and Bathinda, under-construction in 2025.
- * 6b. Sehna–Fazilka Expressway', greenfield, via Sri Muktsar Sahib.
Planned but awaiting approval by the MoRTH (as of July 2025)
7. Kishtwar–Ludhiana–Hisar–Jaipur–Kota–Mandsaur Expressway,- * 7a. Ludiana–Hisar–Jaipur–Kota Expressway, greenfield, Ballowal, Longowal, Bhuna, Hisar, Isharwal-Jhumpa, Loharu-Pilani, Surajgarh, Singhana, Neem ka Thana, Chomu, Jaipur, Phagi, Tonk-Dhooni, Bundi, Kota-Rawatbhata spur, Bjinlot.
- ** Isharwal–Jhumpa spur,
- ** Bahal–Jui Khurd spur
- ** Loharu–Pilani spur,
- ** Madhogarh –Chirawa spur
- ** Singhana–Narnaul spur,
- ** Behror–Nangal Chaudhary–Gudha Gorji-Fatehpur Spur.
- ** Kuchaman–Khatoo–Reengus to Ajeetgarh–Shahpura spur to Delhi–Jaipur Super Expressway.
- ** Jaipur spur to Delhi–Mumbai Expressway
- ** Bijolia–Kota spur.
- * 7b. Sukhnai–Mungli–Kishtwar route, greenfield.
- * 7c. Kishtwar–Chamba–Ludhiana route, mix of greenfield and brownfield. From Kishtwar, Bhaderwah, Chamba, Chauti Khas, Sihunta, Tilok Nath, Jawli, Talwara, Hajipur, Passi Kandi, Nangal Bihalan, Gardiwala-Hariana brownfield, Hariana–Attowal greenfield, Attowal–Ludhiana brownfield
- * 7d. Kota–Rawatbhata–Mandsaur route, mix of greenfield and brownfield. From Kota, Rawatbhata, Gandhi Sagar, Rampura, JanodMahagarh greenfield, Mahargarh–Narayangarh–Piplia Mandi, Piplia Mandi–Balaguda–Palthan–Pratapgarh greenfield with PipliaMandi–Mandsaur brownfield spur.8. DSDBO–Chandigarh–Hisar–Beawar–Vadodra–Mumbai route.
- * 8a. Naina Devi–Hisar–Beawar Expressway, greenfield, phase-1. From Naina Devi, Panjhera, Fatehgarh Sahib, Patiala-Sanaur, Cheeka, Kalayat-Narwana, Durjanpur, Barwala, Hisar, Kalod, Bidhwan, Bahal, Chandgothi, Norangpura, Jhunjhunu, Sikar, Kuchaman, Makrana, Bagot, Thanwala–Pushkar, Beawar.
- ** Baddi–Ropar spur
- ** Chandigarh spur
- ** Ambala–Patiala spur
- * Mansa–Cheeka–Pehowa spur
- ** Kaithal spur
- * 8b. Naina Devi–Killar Expressway, phase-2.
- * 8c. Killar–Sasoma-DSDBO Expressway, greenfield, phase-2, Palampur–Bharmour tunnel, Bharmour–Tindi tunnel, Killar–Padum tunnel, Alchi/Nimoo–Thoise tunnel, Thoise–Sasoma tunnel, Saser to DBO.
- ** 8c.1. Sasoma–Saser La Road, under construction including tunnel under Saser La.
- * 8d. Beawar–Vadodra Expressway, greenfield & brownfield upgrades. From Beawar, Asind, Karera, Gangapur, Bhinder, Slumbar, Karwai, Halol, Godhra, Vadodra, Karjan to Dahej.
- *** Rishabhdev-Slumbar-Mandsaur spur.
- *** Banswara-Modasa-Gandhinagar spur9. Ambala–Patiala–Sirsa–Anupgarh Expressway, greenfield, Ambala, Samana, Lehragaga-Budhlada, Sardulgarh, Rania, Elenabad–Tibbi, Pilibanga–Suratgarh, Bajuwala, Anupgarh, Chak 35A & 34A.10. Ferozpur–Sangaria Expressway, greenfield, via Sri Muktsar Sahib, Malout, Sangaria/Chautala.11. Abohar–Moga Expressway, greenfield, via Sri Muktsar Sahib & Faridkot.12. Killar–Pathankot–Fazilka–Sri Ganganagar route.
- * 12a. Sri Ganganagar–Fazilka–Ferozpur Expressway, brownfield upgrade except Ladhuka-Khui Khera-Khuian Sarwar is greenfield.
- * 12b. Ferozpur–Sri Hargovindpur Expressway, greenfield, via Kirtowal, Govindwal Sahib & Beas.
- * 12c. Pathankot–Killar route, brownfield upgrade.