This is a list of electricity-generating power stations in the U.S. state of Texas, sorted by type and name. In 2022, Texas had a total summer capacity of 148,900 MW through all of its power plants, and a net generation of 525,562 GWh. In 2023, the electrical energy generation mix was 51.1% natural gas, 22.2% wind, 13.2% coal, 7.5% nuclear, 5.1% solar, 0.4% other gases, 0.2% biomass, 0.2% hydroelectric and 0.1% other sources. Small-scale photovoltaic installations generated an additional 4,337 GWh to the Texas electrical grid in 2023.
Texas produces and consumes far more electrical energy than any other U.S. state. It generates almost twice as much electricity as the next highest generating state, Florida. Texas has an expanding variety of generating sources to meet consumption growth. Installed wind capacity grew to 35,000 MW and solar capacity grew to 10,300 MW at the end of 2021. Wind generation exceeded nuclear in 2014, and was near to surpassing coal in the number two position in 2019. Fossil-fuel and nuclear generation has remained nearly constant over the past two decades, with natural gas gradually replacing coal.
Texas oil extraction operations in year 2019 included the flaring of 250 billion cubic feet of associated petroleum gas, with much of it concentrated in the Permian basin near Midland. This amount of wasted natural gas could have met all of the state's residential heating and cooking needs, or could have generated an amount of electrical energy nearly equal to the state's 40,000 GWh of nuclear generation.
Fossil-fuel power stations
Data from the U.S. Energy Information Administration serves as a general reference.Coal and lignite
A useful map of coal generation plants is provided by the Sierra Club.| Name | Location | Coordinates | Capacity | Year opened | Scheduled retirement | Refs |
| Coleto Creek | Fannin | 622 | 1980 | Scheduled to close by 2027 | ||
| Fayette | La Grange, in Fayette County | 1,690 | 1979 1980 1988 | |||
| Harrington | Potter County | 1,080 | 1976 1978 1980 | Convert to natural gas by 2025 | ||
| J.K. Spruce | Bexar County | 1,444 | 1992 2010 | |||
| Limestone | Jewett | 1,850 | 1985 1986 | |||
| Major Oak Power | Robertson County | 349 | 1990 1991 | |||
| Martin Lake | Rusk County | 2,380 | 1977 1978 1979 | |||
| Oak Grove | Robertson County | 1,796 | 2010 2011 | |||
| Pirkey | Hallsville | 721 | 1985 | Scheduled to close in 2023 | ||
| San Miguel Lignite Powerplant | Christine | 391 | 1982 | |||
| Sandy Creek | Riesel | 1,008 | 2013 | |||
| Tolk | Lamb County | 1,136 | 1982 1985 | Scheduled to close by 2032 | ||
| W. A. Parish | Fort Bend County | 2,736 | 1977 1978 1980 1982 | |||
| Welsh | Mount Pleasant | 1,116 | 1977 1982 | To cease using coal in 2028 |
Natural gas
Data from U.S. Energy Information Administration.Additional data sources:
| Name | Location | Coordinates | Capacity | Generation type | Year opened | Refs |
| Arthur von Rosenburg | Bexar County | 518.0 | 2x1 combined cycle | 2000 | ||
| Antelope Elk Energy Center | Abernathy, Texas | 738.0 | Reciprocating engine simple cycle | 2011 2016 | ||
| Barney M Davis | Nueces County | 938.0 | Steam turbine 2x1 combined cycle | 1974 2010 | ||
| Bastrop Energy Center | Bastrop County | 540.0 | 2x1 combined cycle | 2002 | ||
| Baytown Energy Center | Chambers County | 800.0 | 3x1 combined cycle | 2002 | ||
| Bacliff | Galveston County | 324.0 | Simple cycle | 2018 | ||
| Bayou Cogen | Harris County | 300.0 | Simple cycle | 2014-2016 | ||
| Black Hawk | Hutchinson County | 225.0 | Simple cycle | 1991/2005 | ||
| Bosque County Peaking | Bosque County | 758.0 | 3x2 combined cycle | 2001/2010 | ||
| C R Wing Cogen | Howard County | 212.0 | 2x1 combined cycle | 1987 | ||
| Cedar Bayou | Chambers County | 1,495.0 | Steam turbine | 1970/1972 | ||
| Cedar Bayou 4 | Chambers County | 502.0 | 2x1 combined cycle | 2009 | ||
| Channel Energy Center | Pasadena | 768.0 | 3x1 combined cycle | 2002/2014 | ||
| Channelview | Harris County | 830.0 | 4x1 combined cycle | 2002 | ||
| Colorado Bend Energy Center | Wharton, Tx | 484.0 | 2x1 combined cycle | 2002/2008 | ||
| Colorado Bend II | Wharton County | 1,140.0 | 2x1 combined cycle | 2017 | ||
| Corpus Christi Energy Center | Nueces County | 469.0 | 2x1 combined cycle | 2002 | ||
| Cottonwood Energy Center | Newton County | 1,180.0 | 1x1 combined cycle | 2003 | ||
| Decker Creek Power Station | Austin | 928.0 | Steam turbine simple cycle | 1975/1978 2008 | ||
| DeCordova | Hood County | 282.0 | Simple cycle | 1990 | ||
| Deer Park | Harris County | 830.0 | 5x1 combined cycle | 2004/2014 | ||
| Eastman Cogen Facility | Harrison County | 410.0 | 2x1 combined cycle | 2001 | ||
| Ennis | Ellis County | 360.0 | 1x1 combined cycle | 2002 | ||
| ExxonMobil Baytown | Harris County | 454.0 | Simple cycle | 1977-2004 | ||
| ExxonMobil Beaumont | Jefferson County | 605.0 | Steam turbine simple cycle | 1966-1993 1993-2005 | ||
| Formosa Utility Venture | Newton County | 597.3 | 7x3 combined cycle | 1994/2003 | ||
| Forney Energy Center | Kaufman County | 1,784.0 | 6x2 combined cycle | 2003 | ||
| Freeport Energy | Brazoria County | 516.0 | Simple cycle 2x1 combined cycle | 1978 1982-1984 | ||
| Freeport Energy Center | Brazoria County | 219.4 | 1x1 combined cycle | 2007 | ||
| Freestone | Freestone County | 951.0 | 2x1 combined cycle | 2002 | ||
| Galveston Power Station 4 | Galveston County | 172.0 | 2x1 combined cycle | 1986 | ||
| Graham | Young County | 624.0 | Steam turbine | 1960/1969 | ||
| Green Power | Galveston County | 624.0 | 3x2 combined cycle | 2003/2009 | ||
| Greens Bayou | Harris County | 330.0 | Simple cycle | 1976 | ||
| Gregory | [San San Patricio County, Texas|Patricio County, Texas|San Patricio County] | 550.0 | 2x1 combined cycle | 2000 | ||
| Guadalupe | Guadalupe County | 1,000.0 | 2x1 combined cycle | 2000 | ||
| Hal C Weaver | UT-Austin | 146.8 | 1x1 combined cycle 1x3 combined cycle | 2004 2010 | ||
| Handley | Tarrant County | 1,265.0 | Steam turbine | 1963/1977 | ||
| Harrison County | Harrison County | 514.4 | 2x1 combined cycle | 2002 | ||
| Hays Energy Project | Hays County | 1,100.0 | Combined cycle | 2004 | ||
| Hidalgo Energy Center | Hidalgo County | 470.0 | 2x1 combined cycle | 2000 | ||
| Houston Chemical Complex | Harris County | 263.0 | 3x1 combined cycle | 1982/2005 | ||
| Ingleside Cogen | San Patricio County | 310.0 | 1x1 combined cycle | 1999 | ||
| J Robert Massengale | Lubbock County | 74.0 | 2x1 combined cycle | 1957/2000 | ||
| Jack County | Wise County | 1,240.0 | 2x1 combined cycle | 2006/2011 | ||
| Jack Fusco Energy Center Brazos Valley | Fort Bend County | 520.0 | 2x1 combined cycle | 2003 | ||
| Johnson County | Johnson County | 267.0 | 1x1 combined cycle | 1996 | ||
| Jones Generating Station | Lubbock County | 820.0 | Steam turbine simple cycle | 1971/1974 2011/2013 | ||
| Knox Lee Power Station | Gregg County | 501.0 | Steam turbine | 1950/1952/1974 | ||
| Lake Hubbard | Dallas County | 915.0 | Steam turbine | 1970/1973 | ||
| Lamar Power Project | Lamar County | 1,036.0 | 2x1 combined cycle | 2000 | ||
| Lewis Creek | Montgomery County | 503.0 | Steam turbine | 1970/1971 | ||
| Lost Pines 1 | Bastrop County | 511.0 | 2x1 combined cycle | 2001 | ||
| Magic Valley | Hidalgo County | 682.0 | 2x1 combined cycle | 2002 | ||
| Midlothian | Ellis County | 1,734.0 | Combined cycle | 2000/2001 | ||
| Montana Station | El Paso County | 352.0 | Simple cycle | 2015/2016 | ||
| Morgan Creek | Mitchell County | 402.0 | Simple cycle | 1988 | ||
| Mountain Creek | Dallas County | 808.0 | Steam turbine | 1956/1958/1967 | ||
| Mustang | Yoakum County | 913.0 | 2x1 combined cycle simple cycle | 1999/2000 2006-2013 | ||
| Newman | El Paso County | 550.0 | 2x1 combined cycle | 1975/2011 | ||
| Nichols | Potter County | 457.0 | Steam turbine | 1960/1962/1968 | ||
| Nueces Bay | Nueces County | 638.0 | 2x1 combined cycle | 1972/2010 | ||
| Odessa Ector | Ector County | 1,135.0 | 2x1 combined cycle | 2001 | ||
| Optim Energy Altura | Harris County | 540.0 | 6x1 combined cycle | 1986 | ||
| O W Sommers | Bexar County | 830.0 | Steam turbine | 1972/1974 | ||
| Oyster Creek | Brazoria County | 425.0 | 3x1 combined cycle | 1994 | ||
| Paris Energy Center | Lamar County | 236.0 | 2x1 combined cycle | 1989 | ||
| Pasadena Cogen | Harris County | 720.0 | 1x1 combined cycle 2x1 combined cycle | 1998 2000 | ||
| Permian Basin | Ward County | 321.0 | Simple cycle | 1988/1990 | ||
| Plant X | Lamb County | 442.0 | Steam turbine | 1952-1964 | ||
| Port Arthur Air Products | Jefferson County | 138.4 | Simple cycle | 2006-2012 | ||
| Port Arthur Refinery | Jefferson County | 550.0 | 5x3 combined cycle | 1957-2011 | ||
| Quail Run Energy Center | Ector County | 472.0 | 2x1 combined cycle | 2002/2007 | ||
| R W Miller | Palo Pinto County | 574.0 | Steam turbine simple cycle | 1968-1975 1994 | ||
| Ray Olinger | Collin County | 320.0 | Steam turbine | 1967/1971/1976 | ||
| Rio Nogales | Seguin, Texas | 800.0 | 3x1 combined cycle | 2002 | ||
| Roland C. Dansby | Brazos County | 204.2 | Steam turbine simple cycle | 1978 2004/2010 | ||
| Sabine / Sabine River Works | Orange County | 2,124.0 | Steam turbine 1x1 combined cycle 2x1 combined cycle | 1962-1979 1987 2001 | ||
| Sam Bertron | Harris County | 875 | ||||
| Sam Rayburn | Victoria County | 205.0 | Simple cycle 3x1 combined cycle | 1963 2003 | ||
| San Jacinto | Harris County | 162.0 | Simple cycle | 1995 | ||
| Sherman | Grayson County | 758.0 | 2x1 combined cycle | 2014 | ||
| Sim Gideon | Bastrop County | 608.0 | Steam turbine | 1965/1968/1972 | ||
| Sand Hill Energy Center | Travis County | 596.0 | Simple cycle 1x1 combined cycle | 2001/2010 2004 | ||
| Stryker Creek | Cherokee County | 669.0 | Steam turbine | 1958/1965 | ||
| Sweeny Cogen | Brazoria County | 436.0 | Simple cycle | 1997/2000 | ||
| T H Wharton | Harris County | 1,025.0 | Simple cycle x4x1 combined cycle | 1967/1975 1972/1974 | ||
| Tenaska Frontier Generation Station | Grimes County | 860.0 | 3x1 combined cycle | 2000 | ||
| Tenaska Gateway Generation Station | Rusk County | 845.0 | 3x1 combined cycle | 2001 | ||
| Temple 1&2 | Bell County | 1,500.0 | 2x1 combined cycle | 2014/2015 | ||
| Texas City Cogen | Galveston County | 451.0 | 3x1 combined cycle | 1987 | ||
| Thomas C. Ferguson | Llano County | 516.0 | 2x1 combined cycle | 2014 | ||
| V H Braunig | Bexar County | 1,050.0 | Steam turbine simple cycle | 1966-1973 2010 | ||
| Victoria | Victoria County | 300.0 | 1x1 combined cycle | 1963/2009 | ||
| W. A. Parish | Fort Bend County | 1,043.0 | Steam turbine simple cycle | 1958-1968 1967/2013 | ||
| Wilkes | Marion County | 879.0 | Steam turbine | 1964/1970/1971 | ||
| Winchester Power Park | Fayette County | 176.0 | Simple cycle | 2010 | ||
| Wise County | Wise County | 670.0 | 2x1 combined cycle | 2004 | ||
| Wolf Hollow 1 | Hood County | 750.0 | 2x1 combined cycle | 2003 | ||
| Wolf Hollow 2 | Hood County | 1200.0 | 2x1 combined cycle | 2017 |
Renewable power stations
Data from the U.S. Energy Information Administration serves as a general reference.Biomass
| Name | Location | Coordinates | Capacity | Refs |
| Nacogdoches Generating Facility | Nacogdoches County | 100 | ||
| Rio Grande Valley Sugar Growers | Santa Rosa | 23.5 | ||
| Snider Industries | Marshall | 5 | ||
| Texarkana Mill | Cass County | 65 | ||
| Woodville Renewable Power | Woodville | 49 |
Hydroelectric dams
Wind farms
The following list emphasizes operating wind farms in Texas that are 100 MW or larger.| Name | Location | Coordinates | Capacity | Turbine manufacturer | Year opened | Refs |
| Amazon Wind Farm Texas | Scurry | 253 | GE Energy | 2017 | ||
| Kinney | 100 | Vestas | 2012 | |||
| Azure Sky Wind Project | 350.2 | 2024 | ||||
| Bearkat Wind Farm | Glasscock | 196.7 | Vestas | 2017 | ||
| Bethel Wind Farm | Castro | 276 | GE Energy | 2017 | ||
| Blue Cloud Wind Farm | Bailey, Lamb | 148.4 | Vestas | 2018 | ||
| Buffalo Gap Wind Farm | Nolan, Taylor | 523.3 | Mitsubishi | 2008 | ||
| Brazos Wind Farm | Scurry | 160 | Vestas | 2003 | ||
| Breunnings Breeze Wind Farm | Willacy | 228 | Acciona | 2018 | ||
| Bull Creek Wind Farm | Borden | 180 | Mitsubishi | 2008 | ||
| Cactus Flats Hill Wind Farm | Concho | 148.4 | Vestas | 2018 | ||
| Camp Springs Energy Center | Scurry | 250.5 | GE Energy | 2008 | ||
| Canyon Wind Farm | 308.8 | 2024 | ||||
| Capricorn Ridge Wind Farm | Coke, Sterling | 662.5 | GE Energy/Siemens | 2008 | ||
| Chapman Ranch Wind Farm | Nueces | 236 | Acciona | 2017 | ||
| Cedro Hill Wind Farm | Webb | 150 | GE Energy | 2010 | ||
| Colbeck's Corner Wind Farm | Carson, Gray | 200 | GE Energy | 2016 | ||
| Desert Sky Wind Farm | Pecos | 160.5 | GE Energy | 2001 | ||
| Elbow Creek Wind Project | Howard | 121.9 | Siemens | 2008 | ||
| Electra Wind Farm | Wilbarger | 230 | GE Energy | 2016 | ||
| Falvez Astra Wind Farm | Randall | 163.2 | GE Energy | 2017 | ||
| Flat Top Wind Farm | Mills | 200 | Vestas | 2018 | ||
| Coke, Sterling | 149.6 | Mitsubishi | 2009 | |||
| Goldthwaite Wind Farm | Mills | 148.6 | GE Energy | 2014 | ||
| Goodnight Wind Farm | 265.5 | 2024 | ||||
| Grandview Wind Farm | Carson | 211 | GE Energy | 2014 | ||
| Green Pastures Wind Farm | Baylor, Knox | 300 | Acciona | 2015 | ||
| Gulf Wind Farm | Kenedy | 283 | Mitsubishi | 2009 | ||
| Hackberry Wind Project | Shackelford | 165 | Siemens | 2008 | ||
| Hale Wind Farm | Hale | 478 | Vestas | 2019 | ||
| Hereford Wind Farm | Deaf Smith | 200 | GE Energy/Vestas | 2014 | ||
| Hidalgo Wind Farm | Hidalgo | 250 | Vestas | 2016 | ||
| Horse Creek Wind Farm | Haskell | 230 | GE Energy | 2016 | ||
| Horse Hollow Wind Energy Center | Nolan, Taylor | 735.5 | GE Energy/Siemens | 2006 | ||
| Javelina Wind Energy Center | Webb, Duval | 748.7 | GE Energy | 2018 | ||
| Jumbo Road Wind | Castro | 300 | GE Energy | 2015 | ||
| Karankawa | Patricio/Bee | 307 | GE Energy | 2020 | ||
| Keechi Wind Project | Jack | 110 | Vestas | 2015 | ||
| King Mountain Wind Farm | Upton | 278.2 | Bonus/GE Energy | 2001 | ||
| Langford Wind Farm | Tom Green, Schleicher, Irion | 150 | GE Energy | 2009 | ||
| Live Oak Wind Farm | Schleicher | 199.5 | Gamesa | 2018 | ||
| Logan's Gap Wind Farm | Comanche | 200 | Siemens | 2015 | ||
| Lone Star Wind Farm | Shackelford, Callahan | 400 | Gamesa | 2008 | ||
| Los Vientos Wind Farm | Starr, Willacy | 912 | Mitsubishi/Siemens/Vestas | 2016 | ||
| Magic Valley Wind Farm | Willacy | 203 | Vestas | 2012 | ||
| Majestic Wind Farm | Carson | 161.1 | Vestas | 2012 | ||
| Mariah North Wind Farm | Parmer | 230.4 | GE Energy | 2016 | ||
| McAdoo Wind Farm | Dickens | 150 | GE Energy | 2008 | ||
| Mesquite Creek Wind | Borden, Dawson | 211 | GE Energy | 2015 | ||
| Miami Wind Energy Center | Roberts, Hemphill, Gray, Wheeler | 289 | GE Energy | 2014 | ||
| Notrees Windpower | Ector, Winkler | 150 | Vestas/GE Energy | 2009 | ||
| Palo Duro Wind Energy Center | Hansford, Ochiltree | 250 | GE Energy | 2014 | ||
| Panhandle Wind Farm | Carson | 400 | GE/Siemens | 2014 | ||
| Panther Creek Wind Farm | Big Spring | 457.5 | GE Energy | 2009 | ||
| Papalote Creek Wind Farm | San Patricio | 380 | Siemens/Vestas | 2010 | ||
| Patriot Wind Farm | Nueces | 226 | Vestas | 2019 | ||
| Peñascal Wind Power Project | Kenedy | 605.2 | Mitsubishi, Gamesa | 2010 | ||
| Prairie Hill Wind Project | Limestone, McLennan | 300 | Nordex | 2020 | ||
| Rattlesnake Wind Energy Center | Glasscock | 207 | GE Energy | 2015 | ||
| Rattlesnake Wind Farm | McCulloch | 160 | Goldwind | 2018 | ||
| Roadrunner Wind Farm | 256 | 2024 | ||||
| Rocksprings Wind Farm | Val Verde | 180 | GE Energy | 2017 | ||
| Roscoe Wind Farm | Roscoe | 781.5 | GE Energy/Siemens/Mitsubishi | 2009 | ||
| Route 66 Wind Farm | Carson, Armstrong | 150 | Vestas | 2015 | ||
| Salt Fork Wind Farm | Donley, Gray | 174 | Vestas | 2016 | ||
| Santa Rita Wind Energy | Reagan | 300 | GE Energy | 2018 | ||
| Shannon Wind | Clay | 204 | GE Energy | 2015 | ||
| Sherbino Wind Farm | Pecos | 300 | Vestas | 2011 | ||
| South Plains Wind Farm | Floyd | 500.3 | Vestas | 2016 | ||
| Spinning Spur Wind Ranch | Oldham, Potter | 516 | GE Energy/Siemens/Vestas | 2015 | ||
| Stella Wind Farm | Kenedy | 201 | Acciona | 2018 | ||
| Stephens Ranch Wind Farm | Borden, Lynn | 376 | GE Energy | 2015 | ||
| Sweetwater Wind Farm | Nolan | 585.3 | GE Energy/Siemens/Mitsubishi | 2007 | ||
| Tahoka Wind Farm | Lynn | 300 | GE Energy | 2018 | ||
| Trent Wind Farm | Nolan | 150 | GE Energy | 2001 | ||
| Trinity Hills Wind Farm | Archer, Young | 225 | Clipper | 2012 | ||
| Turkey Track Energy Center | Nolan, Coke, Runnels | 170 | GE Energy | 2008 | ||
| Wake Wind Farm | Crosby | 257.2 | GE Energy | 2016 | ||
| Wildorado Wind Ranch | Oldham, Potter, Randall | 161 | Siemens | 2007 | ||
| Willow Springs | Haskell | 250 | GE Energy | 2017 | ||
| Woodward Mountain Wind Ranch | Pecos | 159 | Vestas | 2001 |
Solar farms
The following list emphasizes operating solar photovoltaic farms in Texas that are 20 MW or larger.| Name | Location | Coordinates | Capacity | Year Completed | Refs |
| Emerald Grove Solar | Crane County | 31.096018650353134, -102.34498206137978 | 108 | 2022 | |
| Brightside Solar | Live Oak County | 28.453379402854512, -97.97791830349912 | 50 | 2022 | |
| Lumina Solar Project I & II | 641 | 2024 | |||
| Hecate Energy Frye Solar | 500 | 2024 | |||
| Roadrunner 1 & 2 | Upton County | 497 | 2019/2020 | ||
| Orion I+III Solar | 450 | 2024 | |||
| Permian | Andrews County | 420 | 2019 | +40MW battery | |
| Waco Solar | 400 | 2024 | |||
| Five Wells Solar Center | 355.4 | 2023 | +259 MW battery | ||
| Phoebe | Winkler County | 250 | 2019 | ||
| Sparta Solar | 250 | 2024 | |||
| Hopkins Energy | 250 | 2024 | |||
| Rambler Solar | Tom Green County | 200 | 2020 | ||
| Holstein Solar | Nolan County | 200 | 2020 | ||
| Texas Solar Nova 2 | 200 | 2024 | |||
| Cutlass Solar II | 200 | 2024 | |||
| AP Sunray | 200 | 2024 | |||
| Tres Bahias | 196.3 | 2024 | |||
| Oberon | Ector County | 180 | 2020 | ||
| Upton Solar 2 | Upton County | 180 | 2018 | ||
| Midway Solar | Pecos County | 178 | 2019 | ||
| Zier Solar | 160 | 2024 | |||
| Roserock Solar | Pecos County | 157 | 2016 | ||
| Buckthorn Solar 1 | Pecos County | 154 | 2018 | ||
| East Pecos Solar | Pecos County | 120 | 2017 | ||
| Castle Gap Solar | Upton County | 116 | 2017 | ||
| Alamo 6 | Pecos County | 110 | 2017 | ||
| Alamo 7 | Haskell County | 106 | 2016 | ||
| Lamesa Solar | Dawson County | 102 | 2017 | ||
| Lapetus | Andrews County | 100 | 2019 | ||
| BPL Crown Solar | 100 | 2024 | |||
| BPL Sol Solar | 100 | 2024 | |||
| Alamo 5 | Uvalde | 95 | 2016 | ||
| Pearl Solar | Pecos County | 50 | 2017 | ||
| SolaireHolman Solar | Brewster County | 50 | 2017 | ||
| Ivory | Dawson County | 50 | 2018 | ||
| Alamo 1 | San Antonio | 41 | 2013 | ||
| Alamo 4 | Brackettville | 2014 | |||
| Webberville Solar Farm | Webberville | 30 | 2011 |
Utility companies
*- NRG Energy includes Reliant Energy, Green Mountain Energy
- CenterPoint
- AEP
- Austin Energy*
- Calpine
- CPS Energy*
- El Paso Electric
- Entergy, Texas Is a separate subsidiary of Entergy Corporation
- Lubbock Power and Light*
- Lower Colorado River Authority*
- Luminant
- Panda Energy International
- Quanta Services
- Pedernales Electric Cooperative
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
- Medina Electric Cooperative
*
*
*
- Northeast Texas Electric Cooperative
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*