List of power stations in New Mexico
This is a list of electricity-generating power stations in the U.S. state of New Mexico, sorted by type and name. In 2023, New Mexico had a total summer capacity of 10,724 MW through all of its power plants, and a net generation of 39,269 GWh. The electrical energy generation mix in 2024 was 38.1% wind, 29.6% natural gas, 21% coal, and 10.8% solar PV. Biomass, geothermal, and hydroelectric generated less than a 1% share combined.
Small-scale solar including customer-owned photovoltaic panels delivered an additional net 801 GWh to New Mexico's electricity grid in 2024. This was less than one-fifth of the amount generated by the state's utility-scale photovoltaic plants.
New Mexico hosts the nation's only long-term underground repository for waste from nuclear weapons research and production, the Waste Isolation Pilot Plant near Carlsbad. Extraction of the state's nearby Permian Basin oil reserves for transportation and other uses rose to the nation's third highest, contributing 6% of total U.S. production in 2018. New Mexico's oil extraction included the flaring of over 35 billion cubic feet of associated petroleum gas in each of the years 2018 and 2019. This amount of wasted natural gas could have generated about 5,000 GWh of electrical energy, an amount equal to 14% of the state's total annual generation.
Fossil-fuel power stations
Data from the U.S. Energy Information Administration serves as a general reference.Renewable power stations
Data from the U.S. Energy Information Administration serves as a general reference.Geothermal
| Name | Location | Coordinates | Capacity | Operator | Year opened | Ref | Note |
| Lightning Dock | Animas, New Mexico | Cyrq Energy | 2014 |
Hydroelectric
| Name | Location | Coordinates | Capacity | Operator | Year opened | Ref |
| Abiquiu Dam | Abiquiu Lake | Los Alamos County | 1994 | |||
| El Vado Dam | El Vado Lake | Los Alamos County | 1935 | |||
| Elephant Butte Dam | Elephant Butte | 28 | United States Bureau of Reclamation | 1916 | ||
| Navajo Dam | Navajo Lake | 30 | City of Farmington | 1989 |
Solar photovoltaic
| Name | Location | Capacity | Year opened | Ref |
| Buena Vista Energy Center | 120 | 2023 | ||
| Roswell Solar Energy Center | 70 | 2016 | ||
| Chavez County Solar Energy Center | 70 | 2016 | ||
| Macho Springs Solar Facility | 52 | 2014 | ||
| NMRD Data Center III | 50 | 2023 | ||
| Jicarilla Solar 1 | 50 | 2023 | ||
| Jicarilla Solar 2 | 50 | 2022 | ||
| Britton Solar Energy Center | 50 | 2019 | ||
| Route 66 Energy Center | 2022 | |||
| Encino Solar Energy Center | 50 | 2020 | ||
| Chaves County Solar II | 30 | 2023 | ||
| Cimarron Solar Facility | 30 | 2011 | ||
| Alta Luna Solar Facility | 28 | 2016 | ||
| Caprock Solar Facility | 25 | 2017 | ||
| Hayhurst New Mexico Solar | 20 | 2023 | ||
| Facebook 2-3 Solar Energy Center Bernalillo County | 20 | 2018 | ||
| San Miguel Solar Energy Center | 20 | 2019 | ||
| Roadrunner Solar Electric Facility | 20 | 2011 | ||
| Taos Mesa Energy Facility Hybrid | 15 | 2022 | ||
| Las Cruces Centennial Solar Farm | 12 | 2012 | ||
| Santolina Solar Energy Center | 2015 | |||
| SunE SPS4 Monument | 2011 | |||
| SunE SPS5 Hopi | 2011 | |||
| SunE SPS1 Dollarhide | 10 | 2011 | ||
| SunE SPS2 Jal | 10 | 2011 | ||
| SunE SPS3 Lea | 10 | 2011 | ||
| South Valley Solar Energy Center | 10 | 2015 | ||
| Rio Communities Solar Energy Center | 10 | 2015 | ||
| Rio Rancho Solar Energy Center | 10 | 2019 | ||
| Facebook 1 Solar Energy Center Valencia County | 10 | 2017 | ||
| Vista Solar Energy Center | 10 | 2019 | ||
| Rio De Oro Solar Energy Center | 10 | 2019 | ||
| Angel Fire Energy Facility | 2023 | |||
| Santa Fe Solar Energy Center | 2015 | |||
| Meadow Lake Solar Energy Center | 2015 | |||
| Manzano Solar | 2013 | |||
| Otero Solar | 8 | 2013 | ||
| City of Gallup Solar | 8 | 2018 | ||
| Hatch Solar Energy Center | 5 | 2011 | ||
| Eubank Landfill Solar Array | 2 | 2013 | ||
| Questa Solar Facility | 1 | 2010 | ||
| Los Alamos Photovoltaic Site | 1 | 2012 |
Wind
| Name | Location | Capacity | Year opened | Ref |
| Sagamore Wind | 522 | 2020 | ||
| Red Cloud Wind | 350 | 2021 | ||
| Clines Corners Wind Farm | 325 | 2021 | ||
| Broadview Wind Project | 324 | 2017 | ||
| La Joya Wind Farm | 306 | 2021 | ||
| El Cabo Wind Farm | 298 | 2018 | ||
| Tecolote Wind | 272 | 2021 | ||
| Oso Grande Wind Farm | 250 | 2021 | ||
| Roosevelt Wind Farm | 250 | 2015 | ||
| Grady Wind Energy Center | 2019 | |||
| New Mexico Wind Energy Center | 204 | 2003 | ||
| Aragonne Mesa Wind Project | 145 | 2022 | ||
| San Juan Mesa Wind Farm | 120 | 2006 | ||
| Duran Mesa Wind Farm | 105 | 2021 | ||
| Red Mesa Wind Energy Center | 2010 | |||
| Borderlands Wind | 100 | 2021 | ||
| High Lonesome Mesa Wind Farm | 100 | 2009 | ||
| Aragonne Wind | 90 | 2006 | ||
| Caprock Wind Ranch | 80 | 2005 | ||
| Casa Mesa Wind Energy Center | 2018 | |||
| Macho Springs Wind Facility | 50 | 2011 | ||
| Milo Wind Project | 50 | 2016 | ||
| Sterling Wind Facility | 2017 | |||
| Wildcat Wind Facility | 2012 | |||
| Anderson Wind Project | 15 | 2014 |