List of Edmonton LRT stations
, commonly referred to as the LRT, is a 29 station light rail system in Edmonton, Alberta. Part of the Edmonton Transit Service, the 21-kilometre Capital Line starts at Clareview in Edmonton's northeast and ends at Century Park in Edmonton's south end. A second route, the Metro Line to areas north of the downtown, opened on September 6, 2015. The Metro Line includes a extension in the LRT system from Churchill LRT Station in downtown Edmonton northwest to NAIT/Blatchford Market Station.
Lines and stations
| Station/Stop | Line | Opened | Average daily boardings | Grade | Parking spaces |
| 2023 | At-grade | 0 | |||
| 2023 | At-grade | 0 | |||
| 1983 | 5231 | Underground | 0 | ||
| 1978 | 4029 | Surface | 761 | ||
| 2023 | At-grade | 0 | |||
| 1978 | 6241 | Underground | 0 | ||
| 2010 | 14607 | Surface | 0 | ||
| 1978 2023 | 9834 | Underground and at-grade | 0 | ||
| 1981 | 8040 | Surface | 1393 | ||
| 1978 | 3444 | Surface | 0 | ||
| 1983 | 9049 | Underground | 0 | ||
| 2023 | Elevated | ||||
| 1989 | 3105 | Underground | 0 | ||
| 2023 | At-grade | 0 | |||
| 2006 | 8446 | Surface | 0 | ||
| 2023 | At-grade | 0 | |||
| 2015 | 2357 | Surface | 0 | ||
| 2015 | 2456 | Surface | 0 | ||
| 2009 | 2104 | Surface | 0 | ||
| 2023 | At-grade | 0 | |||
| 2023 | At-grade | 0 | |||
| 2023 | At-grade | 0 | |||
| 2015 2024 | 2931 | Surface | 0 | ||
| 2023 | At-grade | 0 | |||
| 2009 | 5140 | Surface | 0 | ||
| 2010 | 9250 | Surface | 0 | ||
| 1978 | 2715 | Surface | 520 | ||
| 2023 | At-grade | 0 | |||
| 1992 | 13672 | Underground | 0 |