List of Charleroi Metro stations
The following is the list of the 49 stations of the Charleroi Metro in Belgium, and includes all stations in the Charleroi area network, as well as tram stops that are also served by premetro lines. It also includes 4 unopened stations on the unfinished line to Châtelet that will be renewed and extended.
Central loop
The "central loop" of the Charleroi Metro is grade separated and thus is the portion of the network that effectively operates as an almost fully metro-standards rapid transit system. There are 9 stations on the central loop, and these are served by all four Charleroi Metro lines:
The following 10 stations and 6 tram stops are found on the M1 and M2 lines of the Charleroi Metro:
The following 18 tram stops and the Piges premetro station which is also served by the M1 and M2 lines are found on just the M3 line:
| Name | Type | Character | Lines | Opened | Municipality | Coords |
| Piges | metro | Viaduct | | | Dampremy | |
| Sacré Madame | Tram | Surface | | | Dampremy | |
| La Planche | Tram | Surface | | | Dampremy | |
| Deschassis | Tram | Surface | | | Lodelinsart | |
| Marie Curie | Tram | Surface | | | Lodelinsart | |
| Saint Antoine | Tram | Surface | | | Jumet | |
| Puissant | Tram | Surface | | | Jumet | |
| Chaussée de Gilly | Tram | Surface | | | Jumet | |
| Rue Berteau | Tram | Surface | | | Jumet | |
| Madeleine | Tram | Surface | | | Jumet | |
| Carrosse | Tram | Surface | | | Gosselies | |
| Léopold ↓ | Tram | Surface | | | Gosselies | |
| Calvaire ↓ | Tram | Surface | | | Gosselies | |
| Bruyerre ↓ | Tram | Surface | | | Gosselies | |
| Chaussée de Fleurus ↑ | Tram | Surface | | | Gosselies | |
| City Nord ↑ | Tram | Surface | | | Gosselies | |
| Emailleries ↑ | Tram | Surface | | | Gosselies | |
| Rue du Chemin de Fer ↑ | Tram | Surface | | | Gosselies | |
| Faubourg de Bruxelles | Tram | Surface | | | Gosselies | |
Gilly line: Line M4
The following 6 stations are found on the M4 line of the Charleroi Metro:
Châtelet line: Line M5: Not completed
The following 4 stations are found on the unfinished line to Châtelet. These out-of-service stations were completed in late 1980s but never opened for service. There were 4 more stations planned but the line has been abandoned, and the surface building of the Centennaire station was demolished in 2010s. In early 2021 a decision was made to finish and open the line.
| Name | Type | Character | Lines | Opened | Municipality | Coords |
| Neuville | metro | Viaduct | | — | Montignies-sur-Sambre | |
| Chet | metro | Viaduct | | — | Montignies-sur-Sambre | |
| Pensée | metro | Surface | | — | Montignies-sur-Sambre | |
| Centenaire | metro | Underground | | — | Montignies-sur-Sambre | |
| Champeau | metro | Surface | | — | Montignies-sur-Sambre | 50°24'11.4"N 4°29'16.3"E |
| Léopold | metro | Surface | | — | Montignies-sur-Sambre | 50°24'26.7"N 4°29'34.1"E |