Line 6 (Jinan Metro)


Jinan Metro Line 6 is a rapid transit line of Jinan Metro system. Construction of Line 6 officially started on 29 September 2021. The east section was officially opened for passenger service on 27 December 2025 at 10:15 am, with Line 4 and Line 8.

Stations

The interval between the eastern section of Line 6 is 5 minutes and 30 seconds for peak hours on weekdays, 7 minutes and 30 seconds for normal, and about 10 minutes for low peaks, and the interval on weekends is the same as that of peak and low peak hours on weekdays.