Line 5 (Suzhou Metro)
Line 5 is a southwest–northeast line of the Suzhou Metro system. It opened on June 29, 2021. The line is 44.1 kilometers long. Its south-western terminus is at Taihu Xiangshan station in Wuzhong District, with its north-eastern terminus at Yangchenghu South station in Suzhou Industrial Park.
50 six-car Class B fully automated subway trains were ordered for the line.