Line 2 (Taiyuan Metro)


The Line 2 of Taiyuan Metro is the first line in Taiyuan, as well as the first line in Shanxi. The line opened on December 26, 2020.

Stations

Phase 1 of Line 2 runs from in the north to in the south and has 23 stations.

Construction

Line 2 began construction in March 2016, as of July 2020, construction of all 23 stations are complete.
In phase 1, it has a total length of 23.647 km, 23 stations, 2 electrical stations and 1 control centre.

Security

There will be 3,500 cameras installed during Phase 1 alone, Dananmen Station, a major interchange station, has 231 cameras installed. All trains are unmanned and equipped with state-of-the-art technology.