Line 2 (Taiyuan Metro)
The Line 2 of Taiyuan Metro is the first line in Taiyuan, as well as the first line in Shanxi. The line opened on December 26, 2020.
Stations
Phase 1 of Line 2 runs from in the north to in the south and has 23 stations.Construction
Line 2 began construction in March 2016, as of July 2020, construction of all 23 stations are complete.In phase 1, it has a total length of 23.647 km, 23 stations, 2 electrical stations and 1 control centre.