Line 2 (Changchun Rail Transit)


Line 2 of the Changchun Rail Transit is a rapid transit line running from west to east Changchun.

History

Phase 1

Phase 1 of Line 2 started operation on 30 August 2018. It is 20.5 km long with 18 stations.

Western extension

The western extension to opened on 8 October 2021. The extension is 4.36 km in length.

Service routes

Future Development

;Eastern extension
An eastern extension to Wukaihe Dajie Station is under construction. The extension is 10.607 km in length. It's scheduled to open in 2025.