Line 2 (Changchun Rail Transit)
Line 2 of the Changchun Rail Transit is a rapid transit line running from west to east Changchun.
History
Phase 1
Phase 1 of Line 2 started operation on 30 August 2018. It is 20.5 km long with 18 stations.Western extension
The western extension to opened on 8 October 2021. The extension is 4.36 km in length.Service routes
- —
Future Development
;Eastern extensionAn eastern extension to Wukaihe Dajie Station is under construction. The extension is 10.607 km in length. It's scheduled to open in 2025.