Lemon Dam
Lemon Dam is an earthen dam, and is a project of the United States Bureau of Reclamation. It was completed in 1963, at high and long at its crest. The dam impounds the Florida River for flood control and irrigation water storage, operated by the local Florida Water Conservancy District. 120 kW of hydroelectric power is generated here.
Lemon Reservoir is about long, wide, has a total surface area of and a total capacity of.