The Howrah–Panskura stretch has three lines. Platform No 1 and 2 are attached but Platform No 3 is detached from the other two Platforms. Usually down trains are available on Platform no 1. Up trains are available on platform no 2 & 3. To reaching both platforms one have to climb a hill like slope. The distance between two platforms are more than 150meter and the slope is more than 15 meter high from the Kolaghat locality.
Electrification
The Howrah–Kharagpur line was electrified in 1967–69.