Kathmandu–Terai Expressway
Kathmandu–Terai/Madhesh Expressway or NH33, also known as Fast Track, is an under construction road connecting Kathmandu and Nijgadh in southern Terai region of Nepal. The road is long, of which, is normal roads, is bridges and is tunnels. The expressway is being constructed by Nepal Army, originally scheduled to be completed by September 2021. The new set target date for completion is April 2027. As of June 2025, around 41% of the work has been completed.
The consulting service for the construction is provided by Yooshin Engineering, Korea Expressway Corporation and Pyunghwa Engineering Corporation, Korean firm. The most complicated section, including the tunnels and several bridges will be constructed by Chinese companies China State Construction Engineering, Poly Changda Engineering and others.