Gordon Power Station
The Gordon Power Station is the largest conventional hydroelectric power station in Tasmania, Australia; located in the South West region of the state. The power station is situated on Gordon River. Water from Lake Gordon descends underground past the Gordon Dam and into the power station.
The power station was opened in 1978 and refurbished in 2024.
Technical data
The Gordon Power Station system comprises three Francis-type turbines that have a combined generating capacity of of electricity, covering about 13% of the electricity demand of Tasmania. The first two turbines were commissioned in 1978, before the third was commissioned a decade later in 1988.The power station is fuelled by water from Lake Gordon. Water from Lake Pedder is also drawn into Lake Gordon through the McPartlans Pass Canal.
The station output is fed from each machine by 18 kV aluminium busbars to the surface switchyard then passes through three 18/220 kV power transformers and 220 kV outdoor switchgear to TasNetworks' transmission grid. The switchyard also houses 22 kV apparatus used for power supply to the station and to the local community. The annual output is estimated to be.