German submarine U-719
German submarine U-719 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II. The submarine was laid down on 3 July 1942 at the H. C. Stülcken Sohn yard at Hamburg, launched on 28 April 1943, and commissioned on 27 July 1943 under the command of Oberleutnant zur See Klaus-Dietrich Steffens. Attached to 5th U-boat Flotilla based at Kiel, U-719 completed her training period on 30 April 1944 and was assigned to front-line service.
Design
German Type VIIC submarines were preceded by the shorter Type VIIB submarines. U-719 had a displacement of when at the surface and while submerged. She had a total length of, a pressure hull length of, a beam of, a height of, and a draught of. The submarine was powered by two Germaniawerft F46 four-stroke, six-cylinder supercharged diesel engines producing a total of for use while surfaced, two Garbe, Lahmeyer & Co. RP 137/c double-acting electric motors producing a total of for use while submerged. She had two shafts and two propellers. The boat was capable of operating at depths of up to.The submarine had a maximum surface speed of and a maximum submerged speed of. When submerged, the boat could operate for at ; when surfaced, she could travel at. U-719 was fitted with five torpedo tubes, fourteen torpedoes, one SK C/35 naval gun, 220 rounds, and two twin C/30 anti-aircraft guns. The boat had a complement of between forty-four and sixty.