German submarine U-219
German submarine U-219 was a Type XB submarine of Nazi Germany's Kriegsmarine during World War II. The U-boat was laid down on 31 May 1941 at the Germaniawerft yard at Kiel as yard number 625, launched on 6 October 1942, and commissioned on 12 December 1942 under the command of Korvettenkapitän Walter Burghagen.
Initially built as one of eight submarine minelayers, after her first patrol she was converted into a transport and tanker submarine, before being used as a blockade runner to deliver supplies to the German naval squadron operating in the Indian and Pacific Oceans. Upon arriving in Indonesia in December 1944, U-219 remained there for several months because of several mechanical problems, with its return trip to Germany with war materials being delayed. In May 1945 she was given by its crew to the Japanese after Germany's surrender, and was commissioned into the Imperial Japanese Navy as I-505 on 15 July 1945. She was never assigned a Japanese crew and was captured by the British after Japan's surrender, being sunk in February 1946 by the Royal Navy along with several other captured U-boats.
Design
The Type XB submarine was designed in 1938 to serve as a minelayer. Weighing at 2,710 tons when submerged and fully loaded, it was the largest class of U-boats ever built, and therefore had reduced maneuverability and agility. The Type XB could carry 66 Schachtmine A mines in 30 mine shafts, with several in the forward hull and several in saddle tanks on each side of the submarine. When the submarine was used for cargo duty, the mine shafts could be used to carry freight containers.''Kriegsmarine''
The U-boat was laid down on 31 May 1941 at the Germaniawerft yard at Kiel as yard number 625, launched on 6 October 1942, and commissioned on 12 December 1942 under the command of Korvettenkapitän Walter Burghagen. On the same day, she was assigned to the 4th U-boat Flotilla for training. On 1 July 1943, she was reassigned to the 12th U-boat Flotilla based in Bordeaux, France.First patrol
U-219 left Bordeaux on 5 October 1943 and traveled to Kristiansund, Norway, arriving on there on 7 October, and staying for less than a day before proceeding to Bergen, where she arrived on 9 October. She was initially supposed to carry out a minelaying patrol in the North Atlantic, but this plan was cancelled. From there, U-219 departed Bergen with orders to join the Monsun Gruppe in the Indian Ocean and lay mines west of Cape Town and Colombo, Ceylon. She ventured to the South Atlantic by first rounding the British Isles and heading south, west of Ireland, to meet with the second squadron of Monsun Gruppe U-boats on their way to the Indian Ocean.Although U-219s mission had been to lay mines off Cape Town and Colombo, when the group's U-tanker ("Milk Cow") was destroyed, U-219 was required to take its place, refueling the other submarines of the group at sea. Of this group, only U-510 continued to Penang, Japanese-occupied Malaysia.
Her orders were then changed and she was told to return to Bordeaux. While U-219 was resupplying U-172 southwest of the Canary Islands on 12 December 1943, the U.S. Tenth Fleet learned of their presence by decoding the orders to U-219 from U-boat Command, and sent two Grumman TBF Avenger torpedo bombers from the escort carrier to their location. U-172 was eventually sunk by the aircraft and the escort carrier's destroyers after a 24-hour chase, and U-219 used that as an opportunity to escape from them. She returned to Bordeaux on 1 January 1944. After her return, U-219 underwent modifications to convert her permanently to a transport submarine. She was also given a snorkel device. and a new lavatory.
Second patrol
After her return, she was prepared to serve as a blockade runner to deliver supplies to the Monsun Gruppe in the Far East. U-219 was outfitted with cargo instead of mines. It took three or four months to complete her outfitting and planning for the operation, and the Allied invasion of southern France in the summer of 1944 meant that the submarine base at Bordeaux came under aerial bombings, but the U-boats remained undamaged. She underwent several trials between April and May to test her with the new fully loaded cargo, with 12th U-boat Flotilla engineers being aboard. In the first test, the fully loaded U-219 began sinking quickly during a dive, but the engineers stabilized it. After the test they decided to reduce the weight, such as by removing her anti-aircraft gun and ammunition. She still carried some torpedoes, so as not to be completely defenseless.On her next voyage east, U-219 departed Bordeaux on 23 August 1944 with and, two other converted transport submarines. Sources differ on her cargo. According to one source, she was carrying two Japanese officers, and freight which included uranium oxide, blueprints for advanced weapons and part of a consignment of twelve dismantled V-2 rockets for Japan shared with U-195. Another source says there were no foreign passengers or parts for an atomic bomb, but that she was only carrying machine parts, torpedo parts, medical supplies, spare parts for a seaplane at the Penang base, mercury, aluminum, and optical equipment. After leaving Bordeaux, she met up with U-195 and U-180 and they proceeded on their journey.
As U-219 was on its way, it was ordered by U-boat Command to meet up with, on its way back to Europe from Penang after delivering supplies to the Monsun Gruppe and running low on fuel, southwest of the Cape Verde Islands. The message from command to U-219s commanding officer, Burghagen, with the coordinates for the rendezvous point with U-1062 was intercepted by Allied intelligence. The carrier groups of and were alerted to the presence of the submarines and deployed air patrols to search the area. As U-219 was waiting for U-1062, it was attacked five times by three Grumman Avengers from Tripoli on 28 September 1944.
Burghagen ordered the boat to dive after shooting down one of the planes with the boat's anti-aircraft gun, and they remained underwater, managing to evade the sonobuoys that were dropped by the aircraft. U-1062 was sunk with all hands on 30 September, as Burghagen continued waiting. He found a salinity layer in which the boat could drift while using a minimal level of its battery, and remained submerged for nearly 70 hours. The air quality became so bad that they had to return to the surface on 4 October as members of the crew became sick. Burghagen decided to abandon the rendezvous and proceeded to Penang, and avoided another aerial attack on 30 October 1944 off South Africa. It was the final attack on U-219 during the trip. She was redirected by U-boat Command from Penang to Batavia instead because of the frequent Allied attacks on the Penang base. U-219 reported firing torpedoes at a target and heard an explosion, but did not sink any ships. She arrived in Batavia on 12 December 1944, along with U-195.