Gereb Awso


Gereb Awso is a reservoir located in the Inderta woreda of the Tigray Region in Ethiopia. The earthen dam that holds the reservoir was built in 1998 by SAERT.

Dam characteristics

Capacity

Irrigation

Environment

The catchment of the reservoir is 1.21 km2 large, with a perimeter of 4.62 km and a length of 1780 metres. The reservoir suffers from rapid siltation. The lithology of the catchment is Agula Shale. Part of the water that could be used for irrigation is lost through seepage; the positive side-effect is that this contributes to groundwater recharge.