Georgia State Route 24


State Route 24 is a state highway that travels south-to-north in an S-shaped curve through portions of Bulloch, Screven, Burke, Jefferson, Washington, Baldwin, Putnam, Morgan, and Oconee counties in the east-central part of the U.S. state of Georgia. The highway connects Statesboro with the Watkinsville area, via Waynesboro, Louisville, Sandersville, Milledgeville, Eatonton, and Madison.
SR 24 was originally designated from Statesboro to Millen, on a different path than it currently travels. After it was shifted onto part of its current path, it was gradually extended in both directions. It was also extended from Watkinsville to Athens and then Commerce. The paths of SR 15 and SR 24, between Athens and Commerce, were swapped and then reverted to their original paths.
The portion of the highway between Sandersville and Milledgeville is part of the Fall Line Freeway, a divided highway that spans the state from Columbus to Augusta. The Fall Line Freeway is planned to be incorporated into the proposed eastern extension of Interstate 14, a freeway that is currently entirely within Central Texas and may be extended to Augusta.

Route description

Statesboro to Waynesboro

SR 24 begins at an intersection with US 80/SR 26 in Statesboro, within Bulloch County. The highway travels to the east-northeast on East Main Street and intersects US 301 Byp./SR 73 Byp., a bypass around the southern and eastern parts of the city. SR 24 continues to the east-northeast, leaves town, and crosses over the Ogeechee River into Screven County. In Oliver, it intersects SR 17. Then, in Newington, it intersects SR 21. In the main part of town, it meets SR 21 Bus., the former routing of SR 21. The highway curves to the northwest and travels through rural areas of the county and has a brief concurrency with US 301/SR 73 north-northeast of Sylvania. After traveling through Hiltonia, it enters Burke County. In Sardis, it intersects SR 23. The highway continues to the northwest toward Waynesboro. Just before entering town, it intersects US 25 Byp./SR 121 Byp., a bypass around most of the eastern part of town. Approximately later, it enters the city limits of town and intersects US 25/SR 121. The three highways travel concurrently into the main part of town. There, they intersect SR 56/SR 80. At this intersection, SR 24 turns left and begins the westerly part of its routing.

Waynesboro to Milledgeville

SR 24 follows SR 56/SR 80 to the west-southwest. Just outside the city limits, SR 56 departs to the south-southwest, and then SR 80 splits off to the northwest on George Massey Road. After that, SR 24 travels to the west-southwest and enters Vidette. There, it intersects SR 305. Shortly after leaving town, it enters Jefferson County. In Louisville. Just inside the city limits is an intersection with US 1/SR 4. At East 9th Street, SR 24 turns to the right and travels to the northwest. Two blocks later, it intersects US 1 Bus./US 221/SR 4 Bus.. At this intersection, SR 24 turns to the left. The four highways travel to the southwest. Then, at East Broad Street, US 1 Bus./SR 4 Bus. splits off to the southeast, while US 221/SR 24 continue to the southwest. At Rocky Comfort Creek, they leave town. About later, SR 171 joins the concurrency. The three highways cross over the Ogeechee River. Southwest of that crossing, SR 24 splits off to the west and enters Washington County. In Davisboro, it intersects SR 231. After a long, gradual curve, the highway travels toward Sandersville. At Ridge Road, just east of the city limits, the road turns to the right and heads north for less than. It meets SR 540 and the western terminus of SR 88, where it turns left onto SR 540. SR 24 and SR 540 act as a bypass of most of the northern part of the city. They enter the city limits and have an intersection with SR 15. After that intersection, the highways curve to the southwest. Just over after leaving the city limits it meets the western terminus of SR 242. Then, it has an intersection with both the northern terminus of SR 68 and the southern terminus of SR 24 Spur. After that, they begin curving to the northwest. There, SR 540 departs to the northwest. Just before leaving the county, it meets the northern terminus of SR 272. It crosses over Gumm Creek and enters Baldwin County. It travels to the northwest and intersects SR 22. The two highways begin a concurrency to the west. Then, they cross over the Oconee River into Milledgeville. Three blocks east-northeast of Georgia College, they meet the northern terminus of SR 49 and the former northern terminus of SR 112. At Montgomery Street, SR 22/SR 24 turn to the west and skirt along the northern edge of Georgia College. At the northwestern corner of the college, they intersect US 441 Bus./SR 29 Bus.. At this intersection, US 441 Bus./SR 22/SR 24/SR 29 Bus. begin a concurrency to the west. One block later, US 441 Bus./SR 29 Bus. splits off to the west-southwest on West Montgomery Street, while US 441 Bus./SR 24/SR 29 Bus. travel to the north-northwest. At this intersection, SR 24 begins its northern section.

Milledgeville to Watkinsville

Farther to the northwest, next to Hatcher Square Mall Shopping Center, the two highways intersect US 441/SR 29. At this intersection, US 441 Bus. and SR 29 both meet their northern terminus, and US 441/SR 24 travel to the north-northwest. In fact, the two highways are concurrent for the rest of SR 24's length. Farther to the northwest, they cross over the Little River into Putnam County. In the southern part of Eatonton, they intersect US 129/SR 44. This intersection also marks the southern terminus of US 441 Bus./SR 24 Bus.. US 129 joins the concurrency for the rest of SR 24's length. Northwest of there, they intersect SR 16. The concurrency curves to the northeast and meets the northern terminus of US 441 Bus./SR 24 Bus.. On the northern edge of the Oconee National Forest, they meet the northern terminus of what used to be SR 300. Then, they enter Morgan County. The highways continue to the north-northwest and enter Madison. There, they have an interchange with Interstate 20. Approximately later, they meet the southern terminus of US 129 Byp./US 441 Byp./SR 24 Byp.. About later, they meet the southern terminus of SR 24 Spur. Then, US 278/SR 12/SR 83 join the concurrency next to Walton Park. The concurrency passes Hill Park and reach Washington Street, where SR 83 splits off to the northwest. The highways pass by Madison Municipal Airport and meet the northern terminus of US 129 Byp./US 441 Byp./SR 24 Byp. At this intersection, US 278/SR 12 splits off to the east, while US 129/US 441/SR 24 continue to the north. After leaving town, they pass by Youngblood Lake and cross over the Apalachee River into Oconee County. The concurrency passes by Heritage Park and travels through Bishop. They meet the eastern terminus of SR 186 just north of the city limits. Just before skirting along the western edge of Watkinsville, they meet the southern terminus of US 129 Bus./US 441 Bus./SR 24 Bus.. The concurrency has an interchange with SR 53. To the north-northeast, they intersect US 129 Bus./US 441 Bus./SR 15/SR 24 Bus.. At this intersection, US 129 Bus./US 441 Bus./SR 24 Bus., as well as SR 24, all reach their northern terminus. After here, US 129/US 441, now concurrent with SR 15 travel toward Athens.

National Highway System

The following portions of SR 24 are part of the National Highway System, a system of routes determined to be the most important for the nation's economy, mobility, and defense:
  • The portion concurrent with US 301/SR 73 near Hiltonia
  • From SR 88 in Sandersville to SR 49 in Milledgeville
  • The entire length of its concurrency with US 441, from Milledgeville to north-northwest of Watkinsville

    History

1920s to 1940s

SR 24 was established at least as early as 1919 from Waynesboro to SR 12 in Madison. At this time, part of SR 15 was established from SR 45 in Watkinsville to Athens. By the end of September 1921, the path of SR 24, from Waynesboro to Louisville, was shifted northwest to travel north on SR 17 from Louisville to Wrens and then on a sole path from Wrens to Augusta. The former path of SR 24 was redesignated as SR 20. SR 24 was extended slightly to the east on SR 12 in Madison and then north-northwest to SR 15 in Watkinsville. By October 1926, US 1 was designated on SR 24 from Augusta to Louisville. US 129 was designated on SR 24 from Eatonton to Watkinsville and on SR 15 from Watkinsville to Athens. By October 1929, the path of SR 24, from Augusta to Louisville, was reverted to the Waynesboro–Louisville path, replacing SR 20. SR 24's former path, on US 1, was redesignated as part of SR 4. By June 1930, SR 24 was extended south-southeast to SR 21 in Sylvania. In April 1932, it was extended completely concurrent with SR 15 north-northeast to Athens and then on a sole path north-northwest to Commerce. Between November 1932 and May 1933, the southern terminus was truncated to SR 73 north of Sylvania, since SR 73 was extended on this former path into the city. Between November 1946 and February 1948, all of SR 24 that existed at the time was hard surfaced. By April 1949, US 441 was designated on the path of SR 24 from Milledgeville to Commerce. The southern terminus of SR 24 was extended slightly southward on a concurrency with US 301/SR 73 and then to the south-southeast and southwest to SR 21 in Newington.

1950s to 2010s

In 1952, an unnumbered road was established from Oliver to Newington. Between the beginning of 1951 and the beginning of 1958, SR 24 was extended to SR 98 northwest of Commerce. Between July 1957 and June 1960, SR 24 was extended on the Oliver–Newington unnumbered road and then southwest to Statesboro. The paths of SR 15 and SR 24, between Athens and Commerce, were swapped, with SR 24 traveling concurrent with US 129 northwest to Jefferson and then on a sole path northeast to Commerce. Between June 1960 and June 1963, the paths of these two highways were swapped back to their original paths. Between June 1963 and the beginning of 1966, the northern terminus of SR 24 was truncated to its current point, north of Watkinsville. At least as early as 1985, the path of US 441 in Milledgeville was slightly shifted to the southwest, completely concurrent with SR 29 in the city. In 1988, a western bypass of Eatonton, designated as SR 826 was proposed from US 129/SR 44 in Warfield to US 129/US 441/SR 24 north of Eatonton. In 1990, a western bypass of Watkinsville, designated as a northern extension of SR 186, was proposed from US 129/US 441/SR 24 north-northeast of Bishop to US 129/US 441/SR 15 in the southern part of Athens. In 1992, US 129/US 441/SR 24 in the Eatonton area was shifted westward, replacing the path of SR 826. The former path was redesignated as US 129 Bus./US 441 Bus./SR 24 Bus. The western bypass of Watkinsville was then proposed as SR 818. Between the beginning of 1987 and the beginning of 1998, the path of US 129/US 441/SR 24 was shifted westward, replacing the proposed path of SR 818. The former path was redesignated as US 129 Bus./US 441 Bus./SR 24 Bus. Between the beginning of 1994 and the beginning of 2010, the path of SR 24 in Sandersville was shifted northward, onto SR 88. Its former path was redesignated as part of SR 242.