Gassi Touil
Gassi Touil is the name of two geographical locations:
- A specific passage between chains of dunes in the southern part of the Grand Erg Oriental in the Algerian Sahara
- The name of a large natural gas field in this gassi.
The Gassi Touil natural gas field is located at the northernmost point of the gassi, within the commune of Hassi Messaoud. It iis the site of a major liquefied natural gas development project, in which natural gas extracted from the Gassi Touil field will be piped to a liquefaction plant at Djedid. The project was initially developed by Spanish firms Repsol and Gas Natural, but their contract was terminated in 2007 by the Algerian state oil company Sonatrach, which elected to pursue the project on its own.
On November 6, 1961, a gas well fire broke out at Gassi Touil, becoming known as the Devil's Cigarette Lighter. It was finally extinguished on April 28, 1962, by well fire specialist Red Adair.
The field also produces oil, first discovered in 1961, from 38 wells as of 2008.