Flexity Freedom


The Flexity Freedom is a family of low-floor, articulated light rail vehicles developed by Bombardier Transportation, and Alstom, for the North American market. It is marketed as part of the Flexity family which includes other models of trams and light metro vehicles. They are produced in facilities in Thunder Bay and Kingston, Ontario.
First introduced in 2011, the Flexity Freedom is used on the Ion rapid transit in Kitchener and Waterloo, Ontario, and on the Valley Line in Edmonton. It is planned for use on the Line 5 Eglinton light rail system in Toronto.
Being entirely low-floor, these vehicles directly compete with the Flexity Swift, Citadis, Siemens S70, Urbos, Kinki Sharyo, and Hyundai Rotem light rail vehicles. However, as they are designed for light rail rather than streetcar applications, they also compete against, to a lesser extent, low-floor streetcars from Škoda/Inekon and Brookville Equipment Corporation, among others.

Design

The vehicles all have a 100% low-floor design and can be built to operate unidirectionally or bidirectionally. The vehicles' design includes energy-saving features, like regenerative braking and the use of LED lighting, but they are also air-conditioned. The vehicles may be coated in special paint designed to resist graffiti. They are equipped with passenger counters at the doors.
The vehicles are articulated, but unlike competing rolling stock, they are built out of similar-length modules. Operators can alter the number of intermediate modules, thus altering the capacity of the individual vehicles. The Toronto and Kitchener-Waterloo vehicles will contain five modules, while those in Edmonton have seven modules. Vehicles can be coupled and operated as trains of up to four connected vehicles.
The maximum passenger capacities, in the standard seating layouts, are 135 and 251, for the three and five-module configurations respectively. When run in the five-module configuration, with train-sets of four vehicles, a maximum capacity of 30,000 passengers per peak hour can be achieved. The vehicles' standard passenger configuration can safely accommodate up to four passengers in wheelchairs. For example, the trains for Edmonton carry up to 275 passengers per train.
According to Bombardier, the trainsets can be built for "catenary-free" power, where, instead of being powered by direct contact with overhead wires, they are powered indirectly through induction, through buried loops, a form of ground-level power supply competing directly with the Alstom APS system.

Orders

Toronto

Delivery

The Flexity Freedom cars were designed for the Transit City plan which would have created six suburban LRT lines for an order of about 300 cars. Only two of these projects were active in 2016: the Eglinton Crosstown line, the first to go into construction, and the Finch West LRT, which was approved later. Metrolinx placed its first order for 182 vehicles under a -million contract announced in 2010. Of the 182 vehicles ordered, 76 were for the Eglinton Crosstown line and 23 for the Finch West LRT. Bombardier expected deliveries to start in 2018.
By May 2016, Metrolinx had not received the prototype vehicle that Bombardier was supposed to produce by spring 2015. The prototype, once received, would be tested for one or two years to work out any design bugs before Bombardier begins to manufacture the rest of the order.
In July 2016, Bombardier spokesman Marc-André Lefebvre acknowledged receipt of "a contractual notice" from Metrolinx complaining about the delay in delivery of the prototype vehicle. Lefebvre said that the prototype would be delivered in August giving Metrolinx 18 months to test the vehicle, about double the time needed for testing. Lefebvre also said production would begin in spring 2018 and the remainder of the 182-car order would be delivered in time for the scheduled opening of the line. On September 1, 2016, Bombardier said the prototype was nearing completion at the Thunder Bay plant and would be available for testing in 3 to 4 weeks.
In September 2016, the province allowed consortia to include the delivery of light-rail vehicles in their bid to build the Finch West LRT, implying it might not use Flexity Freedom vehicles. Metrolinx was also considering such an approach for its two LRT projects outside of Toronto: the Hurontario LRT and the Hamilton LRT, the latter cancelled by the province in December 2019 due to cost.
In November 2016, Metrolinx gave formal notice of intent to cancel its contract with Bombardier. Metrolinx alleged unacceptable delivery delays fearing that the opening of the Eglinton Crosstown line would be delayed due to a lack of vehicles. Bombardier claimed it could complete the order on time. Metrolinx also alleged that the prototype could not handle basic functions such as taking power from an overhead catenary. Bombardier claimed the prototype functioned properly, and that it was conducting static tests before doing moving tests with power taken from a catenary.
In late November 2016, Bombardier shipped the first pilot vehicle from its Thunder Bay plant to its Kingston plant to continue testing. The vehicle was still expected to require nine months of qualification testing.
By 2016, Metrolinx had inspected Bombardier's plants several times in both Thunder Bay, Ontario, and Sahagun, Mexico, and concluded that quality control was "plagued by welding issues as a result of poor training, incorrect procedures, faulty equipment and poor management". Metrolinx also discovered that quality control standards were inconsistent between the two plants. Bombardier acknowledged the problems but claimed they had since been resolved.
On March 2, 2017, Metrolinx filed court affidavits to support its action to terminate the Flexity Freedom contract due to high financial risks. If Bombardier failed to deliver on time, Metrolinx would be liable to pay Crosslinx Transit Solutions, the consortium building the Crosstown, $500,000 per day while Bombardier would be liable to pay only $1,500 per day per late vehicle.
After Metrolinx failed in its court action against Bombardier, it announced on May 12, 2017, that it had signed an order for 61 light rail vehicles with Alstom, a competitor of Bombardier. If Bombardier delivers the Flexity Freedom vehicles on time to service the Eglinton Crosstown line, then Metrolinx will assign 17 Alstom Citadis Spirit light rail vehicles to the Finch West LRT and 44 to the Hurontario LRT. However, If Bombardier is late in delivery, the Alstom units will serve the Eglinton Crosstown.
On December 21, 2017, Metrolinx and Bombardier announced an agreement to reduce the Metrolinx order for Flexity Freedom vehicles from $770million for 182 vehicles to $392million for 76 vehicles, enough to supply only the Eglinton Crosstown line. The agreement also increased the potential penalty against Bombardier for late deliveries. In exchange, Bombardier received an 18-month extension on their contract to operate and maintain GO Transit rail services on behalf of Metrolinx.
In late October 2018, the first vehicle arrived in Kingston for testing and was scheduled to be delivered to Toronto in November, followed by five more cars by February 2019. The first Flexity Freedom vehicle arrived on January 8, 2019, at the Eglinton Maintenance and Storage Facility. On February 1, 2019, Metrolinx announced that Bombardier had missed the deadline to deliver the first six vehicles.
On November 26, 2019, Metrolinx made an order modification with Bombardier to add communication and signalling equipment to the vehicles. The order change would cost $36.2million plus $3million if Bombardier completed the work on time plus $1.5million to transport the vehicles to Bombardier's Thunder Bay plant. Crosslinx Transit Solutions was responsible for designing the communication and signalling systems, which it completed late. Vehicles already manufactured needed to be retrofitted.
The due date for the acceptance of the first six vehicles is July 1, 2020. Line 5 Eglinton requires only 42 of 76 vehicles ordered for opening day, but Metrolinx expects the first 42 to be delivered by August 1, 2021. The deadline for the balance is March 31, 2022. By mid-March 2020, Bombardier had manufactured 30 vehicles, of which Metrolinx has given final acceptance to two.

Features

The Toronto vehicles were originally to have two cabs per vehicle but in 2013, Metrolinx changed the order to eliminate one cab. Thus, instead of a second cab, the rear of each Toronto car contains a passenger area with four side-facing seats and extra standing room. There are auxiliary controls in a cabinet at the rear. Thus, a two-vehicle trainset has a cab at each end with a pair of single-cab vehicles coupled back-to-back.
The Toronto vehicles are equipped with automatic train control with three modes:
  • Vehicles travel driverless within the Eglinton Maintenance and Storage Facility.
  • On the elevated and underground section between Mount Dennis and Laird stations, ATC controls the train between stops with the on-board driver operating the door at stops then pressing a button to proceed to the next station.
  • On the surface section east of Laird station, ATC provides information to the driver, who is in full control of the train.

    Freedom vs. Outlook

Flexity Freedom vehicles are technically similar to the Flexity Outlook vehicles of the Toronto streetcar system but are wider, are capable of higher speeds, and use standard gauge rather than the streetcar system's Toronto gauge. The Flexity Freedom has doors on both sides, while the Flexity Outlook has doors only on the right side of the vehicle as they are not bi-directional, in keeping with all previous generations of Toronto streetcars. While Flexity Outlook vehicles are able to negotiate the tight curves of the largely on-street trackage and its single-point switches, Flexity Freedom vehicles require a minimum curve radius of and conventional double-point switches.
Light rail lines in Toronto, starting with Line 5 Eglinton, will be constructed to standard gauge instead of Toronto's streetcar gauge because Metrolinx, the Ontario provincial transit authority funding the projects, wants to ensure a better price for purchasing vehicles by having a degree of commonality with other similar projects within Ontario.
The Flexity Freedom LRVs have a black and white livery rather than the red and white used on the Flexity Outlook streetcars. In Toronto, light rail lines are considered part of the Toronto subway system whose trains have metallic bodies, to which the black and white livery would have some resemblance.
The following chart compares the features of the Flexity Freedom and Flexity Outlook as used in Toronto.
ComparisonFlexity FreedomFlexity Outlook
UsageLine 5 EglintonToronto streetcar system
Length
Width
Track gauge
SwitchesDouble-pointSingle-point
Maximum grade5–6 %8%
Minimum curve radius
Multi-vehicle trains
Maximum speed
Line voltage 750 V600 V
Current collectorPantograph onlyTrolley pole and pantograph
DirectionBidirectionalUnidirectional
Number of doors8 4
Exterior coloursBlack & whiteRed & white
Presto readers on board