Ermenek Dam
The Ermenek Dam is a double-curvature concrete arch dam located on the Göksu River in Karaman Province, Turkey. The tall dam was the highest in Turkey at the time of its construction and currently ranks third after Deriner Dam and Yusufeli Dam. The development was backed by the State [Hydraulic Works |Turkish State Hydraulic Works]. Completed in 2009, the primary purpose of the dam is to support its 300 MW power station. The Görmeli Ottoman bridge from 1290 was submerged as a result of the completion of the Ermenek Dam.
Ermenek Consortium
Ermenek Dam was constructed by the Ermenek Consortium that was specially created for this project. Member companies of the Consortium are BM Muhendislik ve Insaat A.S., Alpine Bau GmbH, Pöyry Energy GmbH, Alstom Austria AG, VA TECH HYDRO GmbH & Co. and Voith Hydro GmbH & Co.The Consortium was also responsible for provision of full foreign financing for the project, under terms agreeable to the Turkish Treasury.