In 2014, inspectors discovered a crack in one of the bridge's main beams. The Colorado Department of Transportation then closed the bridge to traffic and installed a one-lane, temporary bridge. With the temporary bridge in place, the old bridge was dismantled, its pieces labeled and stored in a warehouse for possible future use as a footbridge or bike trail bridge. CDOT then constructed a new precast-concrete girder bridge, which opened to traffic in 2017.