Dharahara
Dharahara or Bhimsen Stambha, is a tower at the centre of Sundhara, Kathmandu, Nepal. It was first built in 1832 by Mukhtiyar Bhimsen Thapa under the commission of Queen Lalit Tripurasundari and was a part of the architecture of Kathmandu recognized by UNESCO. It has been destroyed and reconstructed several times.
The tower has a spiral staircase containing 213 steps. The eighth floor holds a circular balcony for observers that provides a panoramic view of the Kathmandu Valley. It also has a bronze mast on the roof.
Most of the tower collapsed in the April 2015 Nepal earthquake, but the base remained. A total of 180 bodies were retrieved from the debris of the tower after the earthquake. Reconstruction of the tower commenced in October 2018, and it was partially opened on 24 April 2021, one day before the sixth anniversary of the earthquake. However, construction work on the tower continued until September 2024.
History
Dharahara in Kathmandu was the tallest building in Nepal and the second such tower built by Bhimsen Thapa. The first tower was built eight years earlier in 1824 at his residence, Janarala Bagh, situated at south-east of Sundhara, near Bhotebahal of Kathmandu. It got torn in half during the earthquake of 1834 and was never rebuilt. It was only a year later that Bhimsen Thapa built the second Dharahara, along with the Sundhara, for Queen Lalit TripuraSundari Devi, who was the niece of Bhimsen Thapa.A century later, on 15 January 1934, another earthquake completely destroyed the first tower, and only two of the nine storeys of the second tower remained. The then Prime Minister of Nepal, Juddha Shumsher [Jang Bahadur Rana], subsequently carried out renovation work of the Dharahara tower to fully restore it. After the original Bhimsen Tower was destroyed, Queen Lalit Tripurasundari's tower came to be known as Bhimsen Stambha.The second tower was built in honour of Bhimsen Thapa's feat of taking Nepal's land back in the war. King Rajendra Bikram Shah had given a lalmohar to Bhimsen Thapa in 1835, acknowledging his Commander-in-Chief status and building of Dharahara in Sundhara in 1824, in his honour.
Dharahara was constructed for military usage as a watchtower. When incidents of national importance occurred, bugles were blown from the top floor of the tower. This was the signal for soldiers to assemble. This tradition of bugle trumpeting continued until the collapse of the tower. On one of the sign boards at Dharahara, it is stated that the Dharahara's main purpose was to enable the state and city authorities to summon people to gather on the Tundikhel to hear government announcements, and that it showed ‘the religious harmony between Hindu, Muslim and Christian faiths.'
2015 earthquake
On 25 April 2015, at 11:56 NST, an earthquake with an estimated magnitude of 7.8, hit Kathmandu and its surrounding region, leading to the collapse of the tower. The structure collapsed during lunch hour and only its base survived. According to witnesses, the area was covered with clouds of smoke and in the rubble was heard shouting. The Nepalese Army barricaded the entrance and launched the rescue mission. Some of the bricks from the tower's remains were inscribed with the name of Juddha Shumsher, indicating that it was rebuilt during his tenure.In February 2016, the government decided to rebuild the tower, and Prime Minister KP Sharma Oli and his cabinet ministers contributed one month's salary to the rebuilding. A fund called "I will construct Dharahara" was also established to collect money for the reconstruction. According to Sushil Gyawali, chief executive of the National Reconstruction Agency, the new tower would be earthquake-resistant. The foundation stone of the new tower was laid down on 27 December 2018.
Reconstruction and inauguration
The original one, built by the first prime minister of Nepal Bhimsen Thapa, was destroyed in the 1934 earthquake. Rana Prime minister Juddha Sumsher Rana constructed the second which was destroyed in the April 2015 earthquake. The reconstruction of the monument took place under the coordination of the National Reconstruction Authority.Reconstruction of the tower began in October 2018. The inauguration ceremony was organized for the eve of the sixth anniversary of the Gorkha earthquake. Prime Minister KP Sharma Oli inaugurated the historical Dharahara on 24 April 2021, in Sundhara, Kathmandu.
Despite the inauguration ceremony, construction work on the tower continued with the full opening in September 2024.