Cygnus gas field
The Cygnus gas field is a natural gas reservoir and gas production facilities in the UK sector of the southern North Sea. It is about 150 km of east of the Lincolnshire coast and started gas production in 2016.
The field
The Cygnus field extends over UK offshore Blocks 44/11a and 44/12a. The field was discovered in 1988 by Marathon Oil. The reservoirs are Permian Leman sandstone and Carboniferous sandstone formations and have recoverable reserves of 760 billion cubic feet.In 2019 the Cygnus gas field was jointly owned by Spirit Energy and Neptune Energy, Neptune E&P UK Ltd operates the infrastructure.
Development
Production from the field has been developed in stages. In the first stage gas was produced by wells on the Cygnus Alpha platform and then routed by pipeline to the Bacton Gas Terminal via the Esmond Transmission System. The next stage entailed development of the north west part of the field produced from the Cygnus Bravo platform which was routed 7 km to the Cygnus Alpha installation.Details of the Cygnus field infrastructure are as shown.