Cruz del Sur pipeline
Cruz del Sur pipeline is a natural gas pipeline linking Buenos Aires in Argentina with Colonia del Sacramento and Montevideo in Uruguay.
History
Construction of the pipeline started in March 2001. The pipeline was completed in November 2002 and it was inaugurated by the presidents of Uruguay and Argentina, Jorge Batlle Ibáñez and Eduardo Duhalde on 29 November 2002 in Montevideo.Technical description
The pipeline is long and it has capacity of 1.8 billion cubic meters of natural gas per year. It cost US$150 millions.The offshore section between Punta Lara and Santa Ana across of the River Plate, is long. It has a diameter of and a maximum pressure of. The Uruguayan section is long and has a maximum pressure of.
The pipeline is supplied from the gas fields in the Neuquén Basin.