Cross Country Route
The Cross Country Route is a long-distance railway route in England, which runs from to via,, and or. Inter-city services on the route, which include some of the longest passenger journeys in the UK such as to, are operated by CrossCountry.
It is classed as a high-speed line because its sections from Birmingham to and from Leeds to York have a speed limit of ; however, the section from Birmingham to Bristol is limited to because of numerous level crossings, especially half-barrier level crossings, and the section from Wakefield to Leeds has the same limit because of a number of curves.
History
The Birmingham–Bristol section was built as the Birmingham and Gloucester and Bristol and Gloucester Railways before joining the Midland Railway, the southern forerunner to the cross-country route. From Birmingham to the north-northeast, the line had three separately owned sections, namely the:- Birmingham and [Derby Junction Railway] to Derby, thence the
- North Midland Railway to Leeds, thence the
- York and North Midland Railway.
Most Derby–Nottingham local passenger trains were taken over by diesel units from 14 April 1958, taking about 34 minutes between the two cities.
In the 1990s most services were operated by British Rail's InterCity business unit. As part of the privatisation of British Rail, these were taken over by Virgin CrossCountry in 1997, with the Class 47 hauled Mark 2 and High Speed Train sets replaced by Class 220 and Class 221 diesel multiple units in the early 2000s.
The use of the route for freight has decreased, because of the bulk of haulage switching to roads and the building of the M5, M6 and M1 motorways.
Abortive British Rail proposals for complete electrification
In the 1960s the route was considered for electrification. In the early 1980s, electrification was again discussed at length and documentation for various proposals was produced in 1981. This would have been particularly beneficial for climbing the Lickey Incline between Cheltenham and Birmingham, as many of the early diesels were under-powered. In 1977 the Parliamentary Select Committee on Nationalised Industries recommended considering electrification of more of Britain's rail network, and by 1979 BR presented a range of options that included electrifying the cross-country route by 2000. Under the governments that succeeded the 1976–79 Labour government, the proposal was not implemented.Route
The route is well connected, and shares substantial portions of its route with other lines:- The Severn Beach line in Bristol between Temple Meads railway station|Temple Meads] and
- The South Wales Main Line around
- The Bromsgrove line">Bromsgrove railway station">Bromsgrove line between and
- The Cross-City Line between and New Street
- The Birmingham-Peterborough line between New Street and
- The Midland Main Line between and
- The Wakefield line between and
- The Hallam and Penistone lines between Sheffield and
- The Dearne Valley line between Sheffield and, and between and
- The Selby Line between Leeds and
;Nominal start-point at Derby
Milepost zero for the main predecessor Derby to Bristol route has always been Derby, hence a train travelling the whole route starts out going "up" then becomes "down". The Birmingham to Derby section of the route has a line speed of, while Birmingham to Bristol is restricted to because of a number of half-barrier level crossings.
Electrification
The line is not fully electrified, but some sections are overhead electrified at 25 kV AC such as Bromsgrove to Grand Junction, with further electrified sections around and the East Coast Main Line near. Network Rail stated in 2014 that the line between and would be electrified as part of the Midland Main Line upgrade. However, the electrification programme was severely cut back in July 2017., Network Rail is working on the section between York and Church Fenton. The rest of the section between Leeds and York has electrification planned as part of the Transpennine Route Upgrade, which itself is part of the Integrated Rail Plan for [the North and Midlands]. This plan also includes full Midland Main Line electrification and upgrades.Electrification between Westerleigh Junction and was planned as part of the 21st-century modernisation of the Great Western Main Line, but as of 2024 work has yet to progress beyond Filton East Curve, south-west of.