Chūō Expressway
The Chūō Expressway is a national expressway in Japan. It is owned and operated by NEXCO Central.
Naming
Officially the expressway is designated as the Chūō Expressway Nishinomiya Route, the Chūō Expressway Nagano Route, and the Chūō Expressway Fujiyoshida Route. These designations do not appear on any signage as all sections are signed simply as the Chūō Expressway.Overview
The Chūō Expressway is a major roadway connecting the greater Tokyo and Nagoya urban areas, a role also shared by the Tōmei Expressway. While the Tōmei Expressway follows a coastal route, the Chūō Expressway follows an inland route through the mountainous regions of Kanagawa, Yamanashi, Nagano, and Gifu Prefectures, its highest point being at 157.3 km point sandwiched between the Yatsugatake Mountains and Southern Japanese Alps. In addition, a branch of the expressway in Yamanashi Prefecture known as the Kawaguchiko Route facilitates access to Mount Fuji and the Fuji Five Lakes area.The expressway is 4 lanes for its entire length except for the section between Uenohara Interchange and Ōtuski Junction, which is 6 to 7 lanes. This section was originally 4 lanes as well, however increasing traffic volume led to the construction of a new parallel roadway for Uenohara-bound traffic, with the original 4 lanes of roadway being converted for the use of Ōtsuki-bound traffic only.
Tolls on the section from Takaido Interchange to Hachiōji Interchange are charged at a flat rate. As of October 2024, the toll on this section is 1000 yen for a regular passenger car. Tolls on all other sections of the expressway are assessed according to distance travelled in the same manner as most other national expressways. Also, tolls on the section from Sonohara Interchange to Nakatsugawa Interchange are assessed at 1.6 times the normal rate to account for the high cost of constructing the Enasan Tunnel. Vehicles carrying dangerous materials are forbidden from using this tunnel and must use alternate routes.
History
- December 15, 1967 - Chōfu Interchange - Hachiōji Interchange section opened.
- December 20, 1968 - Hachiōji Interchange - Sagamiko Interchange section opened.
- March 17, 1969 - Sagamiko Interchange - Kawaguchiko Interchange section opened.
- October 5, 1972 - Tajimi Interchange - Komaki Junction section opened, connecting with the Tōmei Expressway.
- September 6, 1973 - Mizunami Interchange - Tajimi Interchange section opened.
- March 5, 1975 - Nakatsugawa Interchange - Mizunami Interchange section opened.
- August 23, 1975 - Komagane Interchange - Nakatsugawa Interchange section opened.
- May 18, 1976 - Takaido Interchange - Chōfu Interchange section opened.
- September 18, 1976 - Ihoku Interchange - Komagane Interchange section opened.
- December 19, 1976 - Nirasaki Interchange - Kobuchisawa Interchange section opened.
- December 20, 1977 - Ōtsuki Junction - Katsunuma Interchange section opened.
- November 16, 1979 - Komaki-higashi Interchange opened.
- March 26, 1980 - Kōfu-Shōwa Interchange - Nirasaki Interchange section opened.
- March 30, 1981 - Kobuchisawa Interchange - Ihoku Interchange section opened.
- November 10, 1982 - Katsunuma Interchange - Kōfu-Shōwa Interchange section opened, completing the entire route.
- November, 1984 - Tsuru Interchange opened.
- March 25, 1986 - Okaya Junction - Okaya Interchange section opened.
- August 28, 1986 - Connection to Higashifuji-goko Road at Kawaguchiko Interchange is completed.
- September 27, 1986 - Nagasaka Interchange opened.
- March 5, 1988 - Okaya Junction - Okaya Interchange section is transferred to the Nagano Expressway.
- September 27, 1989 - Uenohara Interchange opened.
- March 25, 1992 - Sonohara Interchange opened.
- January, 1993 - Renovation of Dangōzaka Service Area completed. The Komaki-bound service area is moved 2 km closer to Tokyo, while the Tokyo-bound service area is moved to the former site of the Komaki-bound service area.
- April 14, 1995 - Inagi Interchange opened.
- March 24, 2002 - Futaba Junction is opened, connecting with the Chūbu-Ōdan Expressway.
- March 16, 2003 - Reconstruction of the Uenohara Interchange - Ōtsuki Junction section is completed.
- March 19, 2005 - Toki Junction is opened, connecting with the Tōkai-Kanjō Expressway.
- October 1, 2005 - Expressway management is transferred from Japan Highway Public Corporation to Central Nippon Expressway Company as a result of the privatization of the national expressway network.
- October 1, 2006 - Futaba Smart Interchange opened.
- June 23, 2007 - Hachiōji Junction is opened, connecting with the Ken-Ō Expressway.
- December 2, 2012 - Sasago Tunnel collapses, killing nine people.
List of interchanges and features
- IC - interchange, SIC - smart interchange, JCT - junction, SA - service area, PA - parking area, BS - bus stop, TN - tunnel, TB - toll gate
Main Route
- Changing areas for snow chains
- *Achi PA - Sonohara IC
- *Hatsukari PA - Katsunuma IC
- *Sutama IC - Nagasaka IC
- *Yatsugatake PA - Kobuchisawa IC
- *Kobuchisawa IC - Suwa-minami IC
- *Okaya JCT - Tatsuno PA
Kawaguchiko Route
- The speed limit on the Kawaguchiko Route is 80 km/h.
- To prevent confusion with the main route, kilometer markers along the Kawaguchiko Route show the distance from Takaido Interchange plus 300
In popular culture